1.
Cracks Treatment Construction Technology of the Danjiangkou Dam Heightening Project
丹江口大坝加高初期工程裂缝处理施工工艺
2.
Water Pricing Research on the First Stage Project of the Western Route of the South-To-North Water Transfer;
南水北调西线一期工程水价初步研究
3.
The Construction of "Great Four Projects"--- The Most Important Task During The Initial Stage of Anhui Institute of Athletics;
安徽体院初创时期应抓好的四大工程
4.
The Study of Initiative TD-SCDMA Network Optimization
TD-SCDMA无线网络工程初期优化的研究
5.
Preliminary analysis on waste water treatment for Huashangou Hydropower Station in construction period
华山沟水电站工程施工期废水处理措施初探
6.
College-Adjustment in Early Days after Founding of New China and Development of Higher Engineering Education;
建国初期的院系调整与高等工程教育的发展
7.
Organization and Management of Major Projects in FEED
重大工程前期研究项目组织与管理初探
8.
Preliminary Study on Silting Promotion Program for the Second Stage of the Qiantan Reclamation Project in Wenzhou Peninsula
温州半岛浅滩二期围涂工程促淤方案初步研究
9.
On problems in Initial Stage of Opera tion of YRDP(Yellow River Dirversion Project);
万家寨引黄工程运营初期所面临问题的初步探讨
10.
Specification for winter construction of building engineering
建筑工程冬期施工规程
11.
The initial four clusters are electronics, information technology, biotechnology and precision engineering.
初期的四个组包括电子、资讯科技、生物科技和精密工程。
12.
Construction is scheduled to start in early 1999 and be completed in 2002.
建筑工程预期在一九九九年初开始,二零零二年底完成。
13.
"Lantau Port Development--Stage 1, Container Terminals 10 and 11 (Preliminary Design) Study"
大屿山港口发展──第一期工程十号及十一号货柜码头(初步设计)研究
14.
An agreement might be signed early next year with construction taking two years.
明年年初双方可能会签署一项为期两年的工程建设协议。
15.
Three-North Shelterbelt Project during the Implementation of Investment and Management in the 10th Five-Year Plan;
三北防护林四期工程“十五”投资执行及管理问题初探
16.
Combine Learning and Teaching with Practice;
研学相长 研有所用——开放教育课题研究工作初期研究过程的启示
17.
The Soil and Water Conservation Effects of Soil-bioengineer In Revetments of Subgrade River Side
土壤生物工程在沿河公路护坡中的初期水土保持效应
18.
Experimental study of tissue-engineered biological SIS membrane employed in Dental Implant Distraction (DID)
组织工程化SIS生物膜的构建及其在同期种植牵引中的初步研究