说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 项目顺序
1)  item order
项目顺序
1.
Adopting sentence-picture verification task technique,this paper describes two experiments designed to examine the item order of propositions representation of Indonesian students understanding Chinese active sentences and passive sentences.
采用句子-图形验证任务初步探讨了不同汉语水平的印尼留学生理解汉语主动句、被动句所形成的命题表征中的项目顺序特点。
2.
Adopting a sentence-picture verification task technique,this paper describes one experiment designed to examine the item order of proposition representations in Chinese readers understanding of Chinese initiative and passive sentence among 34 Chinese college students(14 males and 20 females).
以中国大学生为被试,采用句子—图画验证任务(sentence-p icture verification task)探讨了中国学生理解汉语主动句、被动句所形成的命题表征中项目顺序特点。
3.
This paper describes the experiment designed to examine the item order of proposition representations of English causational clauses,using sentence-picture verification task.
采用句子-图画验证任务(sentence-picture verification task)探讨了英语母语者理解含原因状语从句的英语复合句所形成的命题表征项目顺序特点。
2)  entry-sequenced file
顺序项目文件
3)  ranking of projects
投资项目排列顺序
4)  numerical order
数目顺序
5)  project priority order
项目排序
1.
Proceeding project priority order of trunk road is to make use of funds and make the transportation condition get the best amelioration, so the function of the progromming project can be exerted really.
进行城市干道网项目排序是为了合理利用建设资金使交通运行状况得到最大改善,真正发挥规划方案的作用。
2.
In according to the characteristics of small and medium-sized city road network,the thesis brings forward a whole practical method of planning,which includes forecasting of traffic demand,network programming design method, evaluation indexes and methods of scheme,and project priority order.
在最后的建设项目排序过程中,提出了先采用综合定量比较法确定各个规划期的建设项目,然后应用以干道路网总运行时间为目标的投资优化模型确定近期的干道建设项目,最后结合建设资金和支路建设项目综合考虑确定近期项目排序。
6)  project scheduling
项目排序
1.
By using characteristics of ant colony optimization and heuristic rules of the resource- constrained project scheduling problem (RCPSP),a modified ant colony algorithm is proposed for solving RCPSP.
根据蚁群算法的性质与资源约束项目排序问题(CPSP:Resource-Constrained Project Schedul- ing Problem)的特征,本文给出了蚁群算法中信息素的表示及更新方案、启发信息的计算方法等,由此提出了一种求解RCPSP的修正蚁群算法。
2.
The main problem discussed in this paper is the construction project scheduling mathematical model and a simple algorithm in the uncertain resource environments.
本文主要建立了具有不确定资源约束条件下的结构项目排序问题的一个数学模型。
补充资料:-10识别顺序
分子式:
CAS号:

性质:由大肠杆菌RNA聚合酶识别的启动子中的一个短的核苷酸顺序,即Pribnow顺序或-10顺序。-10顺序的中心位于转录起始位点上游第10对碱基(上游碱基不能转录,均被定为负值,因此上游第10对碱基用-10表示)。该顺序是由一致顺序TATAAT变化而来,是给RNA聚合酶指向的顺序,也是打开DNA双螺旋形成开放启动复合物的区域。如启动子缺少该顺序,则它不能被RNA聚合酶识别,转录也就不能起始。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条