3) leap over
跨越
1.
Insist on innovating the system and push forward a leap over - development of Baogang;
坚持体制创新 促进包钢跨越式发展
2.
In late years particular circumstances in Russia, Marx put forward the theory of "Cauldine Forks": Russia could leap over the stage of capitalism.
马克思针对俄国社会的特殊情况提出了俄国有可能跨越资本主义“卡夫丁峡谷”的著名设想,这一理论对于我国有中国特色的社会主义和东方落后国家未来的社会主义实践有着重要的现实意义。
3.
Only by leap over development strategy can the lag behind countries follow up and overtake the first developed countries.
后发国家唯有实施跨越式发展战略才能赶超先发国家。
4) Span
[英][spæn] [美][spæn]
跨越
1.
Correlative Solution Way and Calculation for Line Span;
单档跨越相关的方法和计算
2.
“Span Issue” in Evolution of Agricultural Technique;
农业科技演进中的“跨越”问题
3.
This paper introduces using DiNiMa catenary to span 220 kV,110 kV electric power line construction without power cut and gains success in the project of Sanxia Xiaogan-Hanyan Ⅱ circuit 500 kV transmission line.
介绍了江西省送变电建设公司在三峡孝感—汉阳Ⅱ回500kV输电线路工程中,采用迪尼玛承力绳不停电跨越220kV、110kV电力线路施工并获成功的方法,该施工方法与传统的跨越施工方法相比,在技术上和经济上都具有较好的优越性,该方法不仅能较好解决电力线路运行单位提出的跨越施工时线路不停电的问题,而且对跨越高速公路铁路,经济作物等跨越施工也具参考价值。
5) spanning
[英][spæn] [美][spæn]
跨越
1.
In recent years,during transmission line construction,nonpowercut spanning methods were widely used while spanning high voltage power lines.
在近年来的输电线路施工中,不停电跨越高压电力线方案得到了越来越广泛的采用。
2.
Using the finite element theory, this paper is concerned with, the dynamic characteristics of a cable-stayed pipe bridge of Zhongqing gas pipeline spanning Fujiang caused by the liquid column accumulation while pigging.
本文利用有限元理论,分析了中青输气管线涪江跨越管桥,在清管时积液柱通过管 桥时的动态力学特性。
3.
The"spanning"is not only that of the social system but also of the productive force.
落后国家能否跨越“卡夫丁峡谷”直接进入社会主义 ,这是科学社会主义理论与建设的重大课题。
6) crossing
[英]['krɔsɪŋ] [美]['krɔsɪŋ]
跨越
1.
On Crossing History Moment and the Development of Socialism;
论跨越历史阶段与中国社会主义发展
2.
This article introduces the mode of using net crossing rope way and the construction of charged crossing 500 kV double lines.
介绍了利用“吊网式”索道跨越的方式带电同时跨越500 kV神大Ⅰ、Ⅱ双回线路施工,为今后带电跨越高压线路提出了一项简捷可靠、经济适用、可灵活机动安排作业的施工方法。
3.
Aimed crossing construction on live EHV transmission lines,aluminium alloy crossing-line shelf is set upand insulating rope covers its top.
针对超高压电力线路架线施工中需要带电跨越问题,采用了搭设铝合金越线架、使用绝缘绳索封顶的施工方法,效果良好;详细介绍了500kV线路全带电跨越220kV运行线路施工的设计、选材及具体施工方法,供同行参考。
补充资料:输出反馈(见线性二次型次优控制)
输出反馈(见线性二次型次优控制)
output feedback
3h日c卜口fon以以{输出反馈型次优控制。(output王eedbaek)见线性二次
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条