1) behindhand items
落后项目
2) follow-up project
后续项目
3) post project evaluation
项目后评价
1.
Study on the method of post project evaluation for FGD in thermal power plant;
火电厂烟气脱硫项目后评价方法研究
2.
The comparison and research on the construction post project evaluation based on AHP and ANP;
基于AHP和ANP的建设项目后评价比较研究
3.
Post project evaluation origins to the United States of America in the 20th century 30`s, and develops quickly between the finance organizes and many countries.
项目后评价起源于20世纪30年代的美国,后来逐渐在金融组织、各个国家得到发展。
4) post-evaluation
项目后评价
1.
The discern method of NPV and IRR influence factor in the post-evaluation;
工程项目后评价中NPV和IRR影响因素识别方法
2.
Identifying method of NPV and IRR influence factor in post-evaluation;
工程项目后评价中NPV和IRR影响因素识别
3.
Application of Gray and Fuzzy synthetic evaluation method for port construction project post-evaluation
灰色模糊综合评价法在港口建设项目后评价中的应用
5) project post-evaluation
项目后评价
1.
In the project post-evaluation, experiences and lessons in the project management cycle can be summarized, and then more project management level can be improved and perfected.
项目后评价是项目管理周期中不可缺少的控制与信息反馈环节。
2.
The theory of the beginning and development of project post-evaluation are reviewed and summarized in this article.
项目后评价是项目周期中一个不可缺少的重要环节,是项目决策管理不可缺少的重要手段,它对改进和完善项目决策水平,提高投资效益具有重要意义。
6) after-project profit
项目后效益
1.
The after-project profit evaluation of agricultural land consolidation is an important part of the study on the land consolidation theory and practice.
农地整理项目后效益的研究是土地整理理论及实践研究的一个重要组成部分。
补充资料:表现落后大市
表现落后大市 Underperform
定义:
研究分析员建议的一种,指一种股票的表现略差于市场回报率。