1) displacement of anchored points
锚碇点位移
1.
In order to calculate the internal force of anchored sheet piling by the method of vertical beam on elastic foundation,the displacement of anchored points or the rigidity factor of supports should be determined first.
采用竖向弹性地基梁法计算有锚板桩墙 ,首先要确定锚碇点位移或支承处刚度系数。
2) anchored point displacement
锚锭点位移
3) anchorage
[英]['æŋkərɪdʒ] [美]['æŋkərɪdʒ]
锚碇
1.
Test study on mechanism of shear-slip of anchorage in suspension bridge;
悬索桥锚碇剪切滑移的机理及试验初探
2.
Design and construction of anchorage system for steel cofferdam;
泸州长江大桥主墩钢围堰锚碇系统的设计与施工
3.
Finite Element Analysis on the Temperature Field of the Massive Concrete Anchorage of Haicang Bridge
海沧大桥大体积混凝土锚碇温度场有限元分析
4) anchor
[英]['æŋkə(r)] [美]['æŋkɚ]
锚碇
1.
As an important part of supporting structure,anchoring controls the project progress of suspension bridge.
锚碇作为承力结构的重要部分,是悬索桥的重点控制性工程。
2.
The paper introduces the experience of applying D-B model to the construction of the south anchor of Wuhan Yangluo Changjiang Highway Bridge.
介绍武汉阳逻长江公路大桥南锚碇工程采用设计-施工总承包模式的经验,对相关的招标和项目管理工作进行总结。
3.
Engineers made 2 plans for position of prestressed steel pipes of the north anchoring system of Wuhan Yangluo Changjiang River Road Bridge.
武汉阳逻长江公路大桥北锚碇锚固系统预应力钢管定位,采用了门式桁架初步固定预应力钢管、安装过程中用全站仪测量,并通过微调装置控制的方法。
5) anchor mound
锚碇
1.
The main steps to prevent temperature crack in anchor mound mass concrete of Changjiang River Bridge in Yichang are described, and all kinds of temperature control methods and effect was present.
介绍了宜昌长江大桥锚碇大体积混凝土施工防止温度裂缝的主要过程 ,并对各种温控措施及其效果进行了评述 ,证明所采取的措施是行之有效和切合实际的。
2.
In this paper,the result of mass concrete temperature monitoring Haicang Bridge east anchor mound is introduced.
介绍了海沧大桥东锚碇大体积混凝土的温度监测结果,结合温控标准研究温控措施的效果。
3.
It is described that the main regulative steps of temperature to prevent slits in the enormous concrete anchor mound construction that is in rock of deep base pit in the south bank of Changjiang River Bridge in Jiangying.
介绍了江阴长江大桥南锚碇深基坑嵌岩锚大体积混凝土施工防止裂缝的主要温控措施。
6) anchoring
[英]['æŋkə] [美]['æŋkɚ]
锚碇
1.
Stability Analysis of the Rockmass in the East Anchoring Area of Guang Dong Humen Bridge;
广东虎门大桥东锚碇岩体稳定性分析
2.
Southern anchoring foundation of RunYang suspension bridge across Yangtse River is a tremendous gravity structure of con-crete.
润扬长江公路大桥南锚碇基础为混凝土重力式结构,体积巨大,基坑采用冻结法止水。
补充资料:钻孔多点位移计
钻孔多点位移计
mutipoint disp lacement meter in boringhole
zuonkong duodion weiy一Ji钻孔多点位移计(rnultipoint displaeementmeter in boringhole)利用一个钻孔测量岩体内不同深度处的位移的地压监测装置。钻孔深度及被测点间距根据测量目的、岩体特性及经济条件而定。钻孔应垂直岩体表面,其深度最好能达到岩体扰动范围以外,使孔底测点不致产生位移。岩体浅部的位移梯度较大,故浅部的被测点间距应当比深部被测点的间距小。 多点位移计主要由测点、基准盘、位移计三部分组成。测点可采用机械锚具或膨胀木,其上固定有钢丝,并引伸至孔口,利用夹头与位移计联接(见图)。位移计有机械式和数字式两类,由测力装置、连接装置、测微装置等几部分构成。安装时,将钢丝拉紧,以消除钢丝弯曲影响测量精度,拉力一般在100N左右。每次测量时,利用测力装置将钢丝拉紧,使其拉力等于初始拉力,测量该点(i点)钢丝的拉出长度绷,即为该点相对于基准点n的位移,若孔底口点相对于n点的位移为△l。,则i点与。点的相对位移占一纽。一创;当。点无位移,则民即为:点沿钻孔轴线的绝对位移。 夹头基准盘测点钻孔号分白 多点位移计测点安装示意图 多点位移计的测量结果,可为支架结构设计、施工及原岩应力推算提供基础资料。采场顶板的位移量,特别是位移速度,是顶板冒落的重要依据,当位移值及位移速度超过预置临界值时,应发出警报。由于各矿岩体特性及地质条件不同,临界值应通过试验或工程类比法确定。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条