说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 漳山发电厂
1)  Zhangshan Power Plant
漳山发电厂
1.
Analysis on the Operation of the Reverse Osmosis Water Treatment System in Zhangshan Power Plant;
漳山发电厂反渗透水处理系统运行状况分析
2)  Zhangping Power Plant
漳平电厂
1.
A Research on Developing Strategy for Fujian Zhangping Power Plant;
福建漳平电厂发展战略研究
3)  Baishan Hydropower Plant
白山发电厂
1.
Study on long-term optimal operation of Baishan Hydropower Plant;
白山发电厂长期优化调度研究
2.
Aiming at the characteristics of the Baishan Hydropower Plant, a comprehensive and automatic control system for the reservoir has been developed; and connected to the computer supervisory system, MIS and dam safe inspection system.
针对白山发电厂的运行特点 ,设计开发了白山发电厂水库调度综合自动化系统 ,并实现了与全厂的计算机监控系统、MIS和大坝安全监测系统联网 ,达到了资源共享、少人值班、远程监控的目标。
4)  Castle Peak Power Station
青山发电厂
5)  Yuanbaoshan PowerPI ant
元宝山发电厂
6)  Taishan Power Plant
台山电厂
1.
The experiences of economic operation realized in lime-stone/gypsum wet FGD system for two 600 MW units of Taishan Power Plant have been presented,and concrete measures for decreasing consumption of electricity,water,and lime-stone being given.
介绍台山电厂2×600 MW机组石灰石-石膏湿法烟气脱硫系统实现经济运行的经验,给出了降低电耗、水耗、石灰石耗量的具体措施。
2.
Based on the observed data,a 2D numerical model for tide and sediment of Guangdong Taishan power plant is developed.
运用建立的广东台山电厂二维潮流泥沙数学模型,在经过实测资料验证的基础上,研究了台山电厂不同取排水工况条件对电厂工程海域的海床地形演变以及电厂航道、港池的泥沙冲淤的影响,计算结果可以为台山电厂二期扩建工程的环境评价和工程优化提供技术支撑。
补充资料:漳橘
1.乳橘的别名。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条