1) the electric field in Tashan
塔山电厂
2) Taer Power Plant
塔尔电厂
1.
The Estimation of Groundwater Resource in Taer Power Plant;
塔尔电厂地下水资源评价
3) Taishan Power Plant
台山电厂
1.
The experiences of economic operation realized in lime-stone/gypsum wet FGD system for two 600 MW units of Taishan Power Plant have been presented,and concrete measures for decreasing consumption of electricity,water,and lime-stone being given.
介绍台山电厂2×600 MW机组石灰石-石膏湿法烟气脱硫系统实现经济运行的经验,给出了降低电耗、水耗、石灰石耗量的具体措施。
2.
Based on the observed data,a 2D numerical model for tide and sediment of Guangdong Taishan power plant is developed.
运用建立的广东台山电厂二维潮流泥沙数学模型,在经过实测资料验证的基础上,研究了台山电厂不同取排水工况条件对电厂工程海域的海床地形演变以及电厂航道、港池的泥沙冲淤的影响,计算结果可以为台山电厂二期扩建工程的环境评价和工程优化提供技术支撑。
4) Longshan Power Plant
龙山电厂
1.
Inquisition into Preserved De-NO_x Solution for 2×600 MW Air-cooling Units in Longshan Power Plant;
龙山电厂2×600 MW空冷机组脱硝预留方案探讨
5) Banshan Power Plant
半山电厂
1.
Operational Security Analysis of Coal Types in Banshan Power Plant;
半山电厂燃用煤种的运行安全性分析
6) Heshan Power Plp
合山电厂
补充资料:IGCC电厂(见整体煤气化联合循环电厂)
IGCC电厂(见整体煤气化联合循环电厂)
Aintegrated gasification combined cycle plant
IGCC电厂bined eyele(integrated gasifieationConl一plant)见整体煤气化联合循环电厂。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条