1) power plant
发电厂
1.
Study on High Availability BOP Control Network in the Power Plant;
发电厂高可用性BOP控制网络设计要点探讨
2.
Problem discussion on powder pollution at workplace in power plant;
发电厂作业场所粉尘污染有关问题的探讨
3.
Development of TIP platform for power plant assets management system;
发电厂设备资产管理系统TIP平台的开发
2) thermal power plant
发电厂
1.
Application of the model 1817LL low-level chloride monitor in thermal power plant;
1817LL型微量氯离子监测仪在发电厂中的应用
2.
In recent years, thermal power plants have used the municipal wastewater after advanced treatment as cooling water; the treatment process is introduced, and the prospect in the use of reclaimed water is predicted.
介绍了近几年发电厂采用经深度处理后的市政污水作为循环冷却水的处理工艺,指出了设计要点,并对发电厂采用市政中水的前景进行了预测。
3.
The mechanism of hydrogen damage on water-wall tubes in thermal power plants,as well as the selection of components used in ultrasonic detecting system for hydrogen damage on water-wall tubes have been presented.
介绍了火力发电厂水冷壁管氢损伤的机理,以及水冷壁管氢损伤超声检测系统各组成部分的选择原则。
3) power plants
发电厂
1.
Operating performance of the Heller air cooling system in large power plants;
发电厂海勒式空冷系统的变工况特性
2.
To deal with the wear and corrosion of some bends used in coal power plants, new cast-in and hoop types of wear-resisting and corrosion-resisting bends were developed.
为解决火力发电厂弯管的磨损和腐蚀问题,研制出新型镶铸型和卡箍型耐磨、耐蚀弯管,提高了弯 管的耐磨和耐蚀性能,其使用寿命是普通合金钢和铸钢管的3-5倍,而且维修方便、成本低,已成功用于多 家大型电厂。
3.
With the steady and rapid development of coal fired power plants, the weakness of usual water ash handling system has become more obvious for its water resource wasting, environment pollution and land occupation.
随着我国燃煤发电厂持续、快速的发展,其水力除灰造成水资源供需矛盾及其产生的环境和占用大量土地等问题日益突出。
4) power station
发电厂
1.
Discussion on differences of smoke exhaust design in electrical room of power station prescribed in relevant codes or regulations;
发电厂配电装置室排烟设计标准探讨
2.
Application of active server page to real-time system of power stations;
动态服务器网页在发电厂生产实时系统中的应用
3.
It is an example for the boiler s water wall bottom assembly hoisting of the Shajiao C Power Station, to expound the method of large-size power station boiler s water wall bottom assembly installation.
以沙角C电厂锅炉水冷壁底部组件吊装为例 ,阐述了这种大型火力发电厂锅炉水冷壁底部组件的安装方
6) electric station
电站,电厂,发电厂
补充资料:北仑发电厂
北仑发电厂
Beilun Power Plant
技术特点主设备的供货厂商及设备概况见表1。 制粉系统采用中速磨煤机直吹系统,每台炉配六台磨。l、2号机组各设一座240m烟自。二期三台锅炉合用一座组合式烟囱,内里三个内径65。。mm钢内筒,高度也是24om。 给水系统采用2x50%容量的汽动给水泵和一台30%容l的电动调速泵。旁路系统采用容量为50%BMCR的高、低压二级串联系统。 输煤系统.电厂的两个5万t级卸煤码头泊位设计年卸煤量可达 1200万t,除满足sx600MW机组的燃煤量外,还有部分余量可中转至镇海电厂。码头配备四台1500~1800t/h抓斗式卸船机和一台1600t/h装船机. 自动化水平1、2号机组分散控制系统采用美国CE公司的MOD一300系统,二期三台机组选用美国BAILEY公司的INFI一90系统。 辅助系统如凝结水精除盐、化学水处理、废水处理、输煤及出灰等均采用可编程控器,以CRT和键盘进行监视和控制。 环境保护大气环境的防治、水体的保护、灰渣的治理、噪声的防治等采取了一系列工程措施,使环境得到了有效的保护。 l号机组在1995年1月、2号机组于1995年5月进行环境监测测试。测定结果表明:北仑电厂及周围地区大气环境中二氧化硫、氮氧化物和总悬浮微粒均未超过国家规定的大气质量二级标准;总平均浓度,SO::o·007 mg/m3,N认:o·020 mg/m,,TSP:o·050mg/m,,分别占二级标准的4.7%,20.。%和16.7%,对废水处理系统、灰渣处理系统、噪声污染也同样进行了严格的监测,也均达到国家标准。 生产实绩一期二台机组运行情况及技术经济指标见表2。裹1主设备的供货厂商及设备概况┌────┬────┬──────────────────────────────────────────┐│机组 │供货厂商│机组概况 │├────┼────┼──────────────────────────────────────────┤│l号机 │日本东芝│ 单轴冲动式、四缸四排汽、双背压凝汽器、八级回热系统。额定功率6。。MW,VWO+5%OP ││ │ │出力为656.619 MW,额定工况热耗7877 kJ/(kw·h) │├────┼────┼──────────────────────────────────────────┤│1号炉 │美国CE │ 强制循环、四角摆动喷嘴切向然烧、一次再热、亚临界汽包炉。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条