1) abutmentdisplacement
坝肩位移
2) dam displacement
大坝位移
1.
A dam displacement autochecking system in which optical CT and CCD technologies are used is described.
介绍采用光学CT和CCD技术的大坝位移自动检测系统,建立适合本课题特点的光学CT数学模型。
3) displacement of dam foundation
坝基位移
1.
In this paper, the grey system method is applied to the analysis of the observed displacement of dam foundation and the concept of the optimum dimension region of the iso-dimensional new information grey model is suggested.
本文应用灰色系统理论对坝基位移观测数据序列进行了分析,提出了等维新息模型存在着最佳维数区这一观点,建立了位移预测灰色模型,并将其成功地应用于千亩岙土坝沉降和侧向位移的预测。
4) dam abutment
坝肩
1.
Study on reinforcement of resisting rock masses of Xiaowan arch dam abutment;
小湾拱坝坝肩抗力岩体加固分析研究
2.
Review on dynamic stability analysis of rock mass in high arch dam abutment;
拱坝坝肩岩体动力稳定性分析研究方法简述
3.
Analysis of influence of Baihetan arch dam thrust on dam abutment;
白鹤滩水电站拱坝推力对坝肩的影响分析
5) abutment
[英][ə'bʌtmənt] [美][ə'bʌtmənt]
坝肩
1.
Deformation and stability analysis of right abutment of Danjiang arch dam;
单江拱坝右坝肩岩体变形稳定计算分析
2.
Three dimensional nonlinear seismic stability analysis of abutment jointed rock mass of high arch dam;
高拱坝坝肩裂隙岩体的三维非线性抗震稳定性分析
3.
Effects of seismic residual deformation of abutment rock on safety of Xiaowan arch dam;
坝肩岩体地震残余变形对小湾拱坝安全度影响
6) dam shoulder
坝肩
1.
There are some weak rock groups within the rock mass of Pangzhuang Reservoir s left dam shoulder, Taigu County, Shanxi Province, under the geological structural action and long-period soaking, these rock groups are easily softened and argillized, their shear strength will be decreased, forming the weak structural plane and the latent slip plane and influencing the stability of the dam.
山西省太谷县庞庄水库左坝肩岩石夹有稳定性较差的软弱岩组,在地质构造作用和长期受浸状态下易软化、泥化,抗剪强度降低,形成软弱结构面,易形成潜在滑移面,影响大坝稳定。
2.
This paper studied the changes of stability factors of Xiaowan arch dam shoulders under two different seepage now conditions.
对比分析了小湾高拱坝两种不同渗压作用下,坝肩滑动块体安全系数的变化情况。
补充资料:肩肩
1.瘦小细长貌。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条