说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 大坝位移
1.
Causes of Less Fitting and Improvement of Temperature Component in Dam Displacement Monitoring Model Based on Rayleigh Distribution and Numerical Integration
大坝位移监控模型温度分量的欠拟合原因及改进
2.
APPLICATION OF STATISTIC-SUPPORT VECTOR MACHINE TO ANALYSIS AND FORECAST OF DAM'S SHIFT
统计-支持向量机模型在大坝位移分析预测中的应用
3.
Calculation shows that th e proposed method can increase the com-putation speed and raise the accurac y of fitting and forecasting dam disp lacement.
实例计算表明,此方法大大提高了运行速度,且能够提高大坝位移的拟合和预测精度.
4.
Analysis on Vertical Displacement Monitoring Data of Jicun Dam Crest
纪村大坝坝顶垂直位移监测资料分析
5.
Predicting the horizontal displacement of a dam is of great importance for its safety.
预测大坝水平位移对于大坝安全来说非常重要.
6.
Study of refraction correction in three-dimension displacement surveying of a dam
大坝三维位移监测中折光改正的研究
7.
So thehorizontal displacements of a dam are normal as a whole.
因此,大坝水平位移变化总体上正常。
8.
The Accuracy Evaluation of Daheiting Dam Vertical Displacement Measurement
大黑汀大坝垂直位移监测精度评定初探
9.
Some Problems on Observation Design of Vertical Displacement at the Gezhouba Large Dam
葛洲坝水利枢纽大坝垂直位移观测设计的几个问题
10.
Horizontal Displacement Observation Upon a Reservoir Dam and Its Accuracy Analysis
岳城水库大坝水平位移观测和精度分析
11.
A High Accuracy Observation Method for Horizontal Displacement of Dams
高精度观测大坝水平位移的一种重要方法
12.
Evaluation and Deformation Analysis on horizontal Displacements of the Dam of Baogang Waterleading Reservoir
宝钢引水库大坝水平位移监测评价和变形分析
13.
Study on the Safety Monitoring Index of Horizontal Displacement of Gutian River First Stage Dam;
古田溪一级大坝水平位移监控指标的拟定
14.
Safety Monitoring Index of Horizontal Displacement of Mianhuatan Dam
棉花滩大坝水平位移安全监控指标的拟定
15.
Displacement and Seepage Monitoring Analysis for Huanren Massive-head Single-buttress Dam
桓仁单支墩大头坝位移及渗流监测分析
16.
In this paper, the method of iteration weighting adjustment is applied to deal with the displacement vector on the top of a dam.
本文采用送代位移权平差方法求取大坝坝顶变形监测点的位移向量。
17.
The Calculation and Analysis of Deflection for Danjiangkou Concrete Dam(from Block No.30 to No.44)
丹江口混凝土坝30至44坝段位移的计算与分析
18.
Treatment for cracks and displacement on upper dam of Lushuihe Hydropower Station
绿水河水电站上坝坝体裂缝及位移事故处理