1) horizontal displacement of dam crest
坝顶水平位移
2) dam horizontal displacement
大坝水平位移
1.
Accuracy analysis on the methods of alignment of observing dam horizontal displacement;
大坝水平位移视准线观测方法及精度分析
3) horizontal deflection on the top of wall
墙顶水平位移
4) horizontal deformation of slope top
坡顶水平位移
1.
Based on measured data,the horizontal deformation of slope top is changed linearly during excavation stage while logarithmically in service stage,and the deformation during excavation stage is 2/3 of the total deformation.
基于干坞边坡施工现场监测数据,分析研究了边坡坡顶水平位移的变化规律,得出坡顶水平位移在干坞开挖阶段呈直线变化,而在使用阶段呈自然对数变化的规律,且施工开挖阶段的位移约占总位移的2/3;建议用边坡变形角点效应比Rc来描述边坡变形随空间的变化规律。
5) pile head horizontal displacement
桩顶水平位移
1.
Water depth and soil parameters heavily affect the pile head horizontal displacement.
0m以下),在风、浪、流、冰的动力荷载作用下,其桩顶水平位移通常大于30cm,易造成栈桥上工艺管线及附属结构的损坏,严重影响正常的油田生产。
6) horizontal displacement at pier top
墩顶水平位移
1.
When the actual closure temperature of a continuous rigid-frame bridge is higher than the designed temperature,the difference will cause a horizontal displacement at pier top and make its structure suffer a temperature-attaching inner force.
提出了两种关于顶推力的计算方法:1)消除墩顶水平位移法;2)消除主梁拉力法。
补充资料:坝顶
坝顶
dam crest
防浪墙人行道重机轨道行道纲顶排水昔(a)(b)图2混凝土重力坝坝顶(蔡长金)bading坝顶(d am crest)坝的顶部结构。包括路面、防浪墙、边石、栏杆、排水沟、灯柱等。土石坝坝顶无交通要求时,坝顶宽度通常按照构造和施工要求决定,并应考虑汛期防汛抢险的要求,一般不小于3米。坝顶路面可采用单层砌石或铺一层密实的碎石、砾石。对高度在15米以下的土石坝,可用草皮路面。有交通要求时,坝顶宽度和路面,按交通要求设计,路面向两侧或一侧做成2一3%的横坡,以便排除雨水。有防浪墙时,坡向下游,并在坝顶下游侧设纵向排水沟,汇集雨水,经坡面排水沟排至下游(见图1)。混浆砌石防浪啧坝顶宽图1土石坝坝顶凝土坝项无交通等特殊要求时,坝顶宽一般不小于2米。坝顶通行车辆和闸门启闭机械时,按交通及吊车、门机等要求设计路面,路面设排水沟,用排水管将水排至上游或排入坝身排水设备中。混凝土重力坝的典型坝顶结构见图2o
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条