1) construction of high pier
高桥墩施工
2) bridge pier construction
桥墩施工
1.
The paper mainly introduces the application quality and economical effect of wood-steel composite formwork in the bridge pier construction.
本文着重介绍了木钢组合模板在桥墩施工中的应用质量和经济效果。
2.
Cofferdam method is often applied for bridge pier construction in the formations with big sand-pebble particles,peripheral anti-seepage method and the construction technology are very important for anti-seepage effect.
对于在砂卵石含量高、粒径较大的地层进行桥墩施工,多利用围堰法,围堰能否正常施工,则其外围的截防渗措施及施工工艺对防渗效果至关重要。
3) high pier construction
高墩施工
1.
Brief talk on effect of the stiff skeleton in the high pier construction
浅谈劲性骨架在高墩施工中的作用
5) construction of double pile pier
双桩桥墩施工
6) high pier
高桥墩
1.
Dynamic buckling of high pier with two ends simply supported under impulse loads
冲击荷载下两端简支高桥墩的动力屈曲
2.
Formed scaffolds are lifted continually step by step to pour concrete resulting in making high pier formed.
滑模工艺采用埋入钢管作为爬杆支承,液压千斤顶产生外力克服滑升时的摩擦力、模架自重和施工荷载,将成型模架体分阶段连续提升,达到混凝土连续浇注,直至高桥墩混凝土墩身成型。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条