1) asphalted concrete
聚宝水电站
2) Baotan Hydropower Station
宝坛水电站
1.
Formwork Design and Engineering of Puojia Hyperbolic Concrete Arch Dam at Baotan Hydropower Station;
宝坛水电站坡甲双曲混凝土拱坝模板设计与施工
2.
Concrete Temperature Control Technology Applied to Double-curvature Arch Dam of Baotan Hydropower Station
宝坛水电站双曲拱坝混凝土温控技术
3) Baoxing hydropower station
宝兴水电站
1.
Design Optimization of Surge Shaft of Baoxing Hydropower Station and Study of Main Construction Technology;
宝兴水电站调压井设计优化与主要施工技术研究
2.
The overlying in the dam site of Baoxing Hydropower Station could be divided into six rock groups on th.
宝兴水电站坝址覆盖层按此依据可划分为6大岩组。
4) Baozhusi hydropower plant
宝珠寺水电站
1.
Application of epoxy material in reinforcement of the draft-tube concrete defect of Baozhusi hydropower plant;
环氧材料在宝珠寺水电站尾水管混凝土缺陷修补中的应用
2.
Safety management of hydraulic structures at Baozhusi hydropower plant;
浅谈宝珠寺水电站水工建筑物的安全管理
5) Baozhusi hydropower station
宝珠寺水电站
1.
Layout and key technical issues of Baozhusi hydropower station;
宝珠寺水电站枢纽布置及重点技术问题
2.
Prototype observation of discharge atomization at Baozhusi Hydropower Station;
宝珠寺水电站泄洪雾化原型观测
3.
The Baozhusi hydropower station is the last mandatory project under state planned economy system.
宝珠寺水电站工程是国家计划经济体制下的最后一个指令性工程,随着水电建设体制改革的进一步发展,宝珠寺水电站工程建设由施工单位总承包转换为业主负责制的建设管理模式。
6) Linjiacun hydropower station
宝鸡峡林家村水电站
1.
Design of plant operating water supply system of Linjiacun hydropower station;
宝鸡峡林家村水电站技术供水系统设计
补充资料:聚宝蒸冬瓜
聚宝蒸冬瓜
原料: 原 料:
原料:嫩冬瓜半个、红萝卜10克、丝瓜10克、冬菇10克、马蹄10克、枸杞10克。调料:熟鸡油10克,盐5克,味精5克,白糖3克,鸡精粉少许、清汤适量。
制法: (1)嫩冬瓜在切断的一边切上花刀,挖去冬瓜内部的籽,红萝卜,丝瓜,冬菇切粒,马蹄去皮切粒,枸杞泡透。
(2)烧锅加水,把冬瓜盅煮片刻拿出,倒干水,然后把红萝卜粒,丝瓜粒,冬菇粒,马蹄粒,枸杞用开水煮过,捞起,放入冬瓜盅内。
(3)然后注入清汤,调入盐、味精、白糖、鸡精粉、熟鸡油,放入蒸柜内,用中火蒸40分钟,拿出即可。
特点: 原料的颜色搭配要合理。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条