说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 宝珠寺电站
1)  Baozushi Hydropower Station
宝珠寺电站
2)  Baozhusi hydropower plant
宝珠寺水电站
1.
Application of epoxy material in reinforcement of the draft-tube concrete defect of Baozhusi hydropower plant;
环氧材料在宝珠寺水电站尾水管混凝土缺陷修补中的应用
2.
Safety management of hydraulic structures at Baozhusi hydropower plant;
浅谈宝珠寺水电站水工建筑物的安全管理
3)  Baozhusi hydropower station
宝珠寺水电站
1.
Layout and key technical issues of Baozhusi hydropower station;
宝珠寺水电站枢纽布置及重点技术问题
2.
Prototype observation of discharge atomization at Baozhusi Hydropower Station;
宝珠寺水电站泄洪雾化原型观测
3.
The Baozhusi hydropower station is the last mandatory project under state planned economy system.
宝珠寺水电站工程是国家计划经济体制下的最后一个指令性工程,随着水电建设体制改革的进一步发展,宝珠寺水电站工程建设由施工单位总承包转换为业主负责制的建设管理模式。
4)  Baozhusi hydropower plant
宝珠寺电厂
1.
This paper presents problems in SF6 circuit breaker at outlet of generator-transformer bank at Baozhusi hydropower plant,annual inspection test and major repair after dismantling.
通过对宝珠寺电厂发变组出口SF6断路器出现的问题、年检预试、解体大修情况的介绍,分析了断路器参数变化的主要原因及处理情况并提出了对策,对同样工况下断路器出现问题的解决具有参考和借签意义,提出了对在承担调峰、调频和事故备用任务电厂使用的高压断路器有待进一步探讨的问题。
2.
Since Baozhusi hydropower plant has been put into commission , hydraulic structures and main mechanical and electrical equipment are well operated ,but some control devices , automation components and auxiliary equipment went wrong leading to shutdown .
对宝珠寺电厂技术改造工作进行了回顾 ,总结了技术改造成功的经验和教
5)  Baozhusi
宝珠寺
1.
By studying the dynamic stratification characteristics of the water body in different seasons in Baozhusi Reservoir by using contrastive experiment,the results show that more than half of the water body\'s physicochemical indexes in May are closely related to the depth of the water.
通过取水样对比试验,研究了宝珠寺水库水体在不同季节里的物理化学指标分层特性,结果显示:5月的水体,超过一半的指标表现出非常明显的水深相关性,而12月的水体,仅有pH、CO32-、矿化度3项指标表现出微弱的水深相关性,其余指标均未表现出深度分层特性。
6)  Baozhusi reservoir
宝珠寺库区
补充资料:拟宝珠
【拟宝珠】
 (杂名)本为佛塔相轮上之宝珠,象其形置于栏杆之柱头者。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条