说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 宝坛水电站
1.
Concrete Temperature Control Technology Applied to Double-curvature Arch Dam of Baotan Hydropower Station
宝坛水电站双曲拱坝混凝土温控技术
2.
Construction Management And Investment Control At The Baozhusi Hydropower Station;
宝珠寺水电站的建设管理与投资控制
3.
Construction Techniques of Rockbolting Beam in Underground Powerhouse at Baoxing Hydropower Station
宝兴水电站地下厂房岩锚梁施工技术
4.
Supervision on the Underground Project and Lower Reservoir of Baoquan Pumped Storage Power Station;
宝泉抽水蓄能电站地下工程及下水库工程监理
5.
High Gravity Dam Baozhusi Hydropower Station Research on Combined Functions of Power Plant with Dam;
宝珠寺水电站高重力坝厂坝联合作用研究
6.
Global 3D Nonlinear Finite Element Analysis on Baozhusi Hydropower Project;
宝珠寺水电站工程三维非线性有限元分析研究
7.
Project Quality Supervision Research for Baoquan Pumped Storage Power Station;
宝泉抽水蓄能电站工程质量监督工作探索
8.
The Binding-together Bidding of the Main Machine Equipment for the Baoquan Pumped Storage Power Station;
宝泉抽水蓄能电站主机设备的统一招标
9.
Analysis of the difference between the actual amount of electricity generated by Baozhusi hydropower station and its designed one;
宝珠寺水电站设计效益与运行效益差异分析
10.
On bad geological phenomenon of Baoquan pumped storage power station project highway
宝泉抽水蓄能电站上库公路不良地质现象分析
11.
The Research on Tunnel Gushing and Collapse Mechanism and Stability of Surrounding Rock in the Gushing and Collapse Section of Hydraulic Tunnel of Baoxing Hydropower Station
宝兴水电站引水隧洞涌水塌方段涌水塌方机制及围岩稳定性研究
12.
Studies on Kinematic Analysis of Rockfall at the Slopes of Switch Station Attached to Baoquan Pumped Storage Power Station;
宝泉抽水蓄能电站开关站边坡落石运动学分析研究
13.
The Heightening Reinforcement Engineering Experience for the Lower Reservoir Dam of the Baoquan Pumped Storage Power Station in Henan Province
河南宝泉抽水蓄能电站下水库大坝加高加固的工程经验
14.
Design Optimization of Surge Shaft of Baoxing Hydropower Station and Study of Main Construction Technology;
宝兴水电站调压井设计优化与主要施工技术研究
15.
3-D Finite Element Analysis of Steel Bifurcation in Huaneng Baoxin Hydrostatic Project;
四川华能宝兴水电站地下钢岔管三维有限元分析研究
16.
Study on Safety Risk Management System Establishment for Baoquan Pumped Storage Power Project;
宝泉抽水蓄能电站项目建设安全风险管理体系构建研究
17.
Safety and Environment Protection,Goal Realization to Put Into Generation,and Striving for the Achievement of the State-level Excellent of Project--The on-the-spot record of the construction of Baoquan Pumped Storage Power Station;
安全环保 达标投产 争创国优——宝泉抽水蓄能电站工程建设目标纪实
18.
Study on Bank Collapse Forecast of the Kari Ravine the Third Accumulation Mass in Qiaoqi Hydropower Station of Baoxing County
宝兴县硗碛水电站咔日沟3号堆积体塌岸预测研究