2) soft rock mass in dam zone
坝区软弱岩体
3) karst-engineering geological condition
岩溶坝区
1.
Stochastic modeling of the permeability coefficient under karst-engineering geological condition;
岩溶坝区透水参数的随机模型
4) abutment rock
坝肩岩体
1.
An analysis of high arch dam abutment rock stability based on nonlinear FEM;
基于非线性有限元法的高拱坝坝肩岩体抗滑稳定分析
2.
The safety of arch dam depends on the stability of dam abutment rock in a large degree.
高拱坝的安全性在很大程度上依赖于坝肩岩体的稳定性,目前在设计中,高拱坝坝肩岩体稳定性分析方法主要是刚体极限平衡法,但该法不能考虑岩体的应力-应变关系,不能很好地反映坝肩岩体的破坏机理以及拱坝与坝肩岩体的相互作用效应。
5) rock mass of dam foundation
坝基岩体
1.
The rock mass of dam foundation of Zaoshi Hydroproject is mainly fine silicarenite with soft layers.
皂市水利枢纽坝基岩体主要为石英细砂岩夹软弱夹层。
6) rock mass of dam abutment
坝肩岩体
1.
When the rock mass of dam abutment is enclosed by faults, joint fissures and bedding planes,it is necessary to carry out holistic anti-slide stability analysis in order to make the abutment withstand potential slide.
当拱坝坝肩岩体为断层、节理裂隙、层面等结构面所围成,有可能产生滑移时,就应进行整体抗滑稳定分析。
补充资料:岩屋坝
岩屋坝
Iwaya Dam
概 述
岩屋坝位于日本岐阜县益田郡金山町、木曾川水系(Kisogawa)飞驿川的支流马濑川上。粘土心墙堆石坝,最大坝高127.5m,水库总库容1.735亿m3。马濑川No.1抽水蓄能电站最大装机容量28.8万kW。工程目的为防洪、灌溉、供水和发电。1973年2月开工,1975年11月主体工程完工。电站于1976年6月投运。
坝址两岸岸坡约35°。坝址基岩为石英斑岩、玢岩等。玢岩呈宽2~10m的岩脉,呈黑色,一般较坚硬,左岸400m高程以上,由于风化作用,使岩质变软。玢岩岩体中有几条破碎带。坝址区不存在活断层。坝址上、下游方向有四条明显的破碎带。右岸上游侧有约20万m3的河岸阶地及岩锥。在填筑大坝前须先挖掉。
坝址控制流域面积1034.9km2,多年平均流量29.5m3/s,水库面积426hm2。有效库容1.5亿m3,防洪库容0.5亿m3。正常洪水流量2400m3/s,设计泄水流量2900m3/s,非常洪水流量3500m3/s。
建筑物包括大坝、溢洪道及发电厂房。
大坝坝顶长366.0m,坝顶宽10m,坝底宽568.75m,坝体积580万m3。左岸设有陡槽式溢洪道,右岸有取水设备和泄水管等附属设施。
溢洪道泄流能力为4000m3/s(特大洪水流量加大1/10)。设置2扇宽10.9m,高18.3m的弧形闸门,闸门用电子计算机操作。
马濑川No.1抽水蓄能电站为混合型抽水蓄能电站,额定水头50~105m,装设2台水泵水轮机,单机出力14.9万kW。
坝体总开挖量582万m3。土石方的最大填筑强度为3.25万m3/d。采用1条4m×9m的隧洞导流。