1.
Stability Analysis of Abutment Rock Mass of Arch Dam at Gai-Xia-Ba, Yun Yang;
云阳盖下坝双曲拱坝坝肩岩体稳定性分析
2.
Effects of seismic residual deformation of abutment rock on safety of Xiaowan arch dam
坝肩岩体地震残余变形对小湾拱坝安全度影响
3.
3D numerical simulation on deformation and stability of high arch dam abutment
高拱坝坝肩岩体变形稳定性的三维数值模拟
4.
Gravity arch dam abutment rock stability and its engineering treatment measurements
重力拱坝坝肩岩体稳定与工程处理对策
5.
Study of Control Effect of Rockmass Structure on Dam Abutment Rockmass Deformation and Failure of High Arch Dam of Tiger Leaping Gorge Hydroelectric;
虎跳峡水电站高拱坝坝肩岩体变形破坏的岩体结构控制效应研究
6.
MONITORING RESULT ANALYSIS OF ROCKMASS STABILITY AT THE LEFT ABUTMENT FOR LIJIAXIA HYDROPOWER STATION
李家峡水电站左坝肩岩体稳定监测成果分析
7.
The Global Stability Safety Research of Jinping Grade One HydroPower Station Arch Dam Abutment Rock;
锦屏一级水电站拱坝坝肩岩体整体稳定安全度研究
8.
The Character of Toppling Deformation Rock Mass on Damsite District and the Analyse for Stability of Dam Abutmet Rock Mass of Miaowei Hydropower Station on Lancang River;
澜沧江苗尾水电站坝址区岩体倾倒变形特征及坝肩岩体稳定性分析
9.
Numerical simulation of toppling rock mass deformation in the right dam abutment of a hydropower station on the Lancang River
澜沧江某水电站右坝肩岩体倾倒变形的数值模拟
10.
As the tension fractures exist, spread and deep weathering is strong, which causes the lowing of the strength of the engineering slope.
正是由于两组张裂隙的存在,使边坡岩体深强风化发育,从而降低了坝肩岩体的强度。
11.
Meshless Method on Seepage in Fractured Rock Mass in Xiaowan Dam Site with 3D Network Computational Simulating Technique for Random Discontinuous;
小湾水电站坝肩岩体裂隙网络渗流的三维网络与无网格法耦合模型研究
12.
Analysis of Combination Pattern on the Resistance Body and Sliding Mass in the Right Abutment of Shankouyan Arch Dam
山口岩拱坝右坝肩抗力体滑移组合模式分析
13.
Study on Systematical Engineering Geology of Controlling Rock Mass Structure in Dagangshan Arch Dam Foundation;
大岗山拱坝坝基(肩)控制性岩体结构的系统工程地质研究
14.
The Geological Evaluation of the Rock Mass Engineering after the Excavation of the Spandrel Trough between the Banks of Xi Luo Du Hydropower Station;
溪洛渡水电站高拱坝两岸拱肩槽开挖后岩体工程地质评价
15.
Rock Mass Structural Features and Its Contral to Dam Shoulders Anti-Sliding Stability in Baihetan Hydroelectric Power Station Dam Site of Jinshajing;
金沙江白鹤滩水电站岩体结构及其对坝肩抗滑稳定性的控制作用
16.
On Engneering Reaction of Complexible Deformation Rock Mass on Right Dam Abutment of Tiger Leaping Gorge Hydroelectric Power Station;
金沙江虎跳峡水电站右坝肩复杂变形岩体工程效应研究
17.
Summary of Reinforcement Treatment of Abutment Rock Body in Xiaowan Hydropower Station
小湾水电站坝肩抗力岩体地质缺陷加固处理管理概述
18.
Numerical Modeling Study on the Deformation Stability of Engineering Rock Mass on High Arch Dam Abutment of Tiger Leaping Gorge Hydroelectric Power Station;
金沙江虎跳峡水电站高拱坝坝肩工程岩体变形稳定性的数值模拟研究