1) face rockfill dam of Hongjiadu Hydropower Station
洪家渡水电站面板堆石坝
1.
The face rockfill dam of Hongjiadu Hydropower Station with a height of 1795 m and ratio of width to height 238 located at karst area where are high mountains and gorges.
洪家渡水电站面板堆石坝处于高山峡谷岩溶地区,坝高179 5m,河床宽高比2 38。
2) Hongjiadu Hydropower Station
洪家渡水电站
1.
Construction of Environment Protection Engineering of Hongjiadu Hydropower Station;
洪家渡水电站环境保护施工
2.
Stable Analysis of Wenchangge Dangerous Rock Mass in Reservoir Area of Hongjiadu Hydropower Station & Surge Forecast When It Falls Down in the Reservoir;
洪家渡水电站库区文昌阁危岩体稳定分析及入库涌浪预测
3.
Construction Quality Control of the Pre-stressed Anchorage Cables at the Consequent Slope of Intake Structure of the Hongjiadu Hydropower Station;
洪家渡水电站进水口预应力锚索施工质量控制
3) Wujiang Hongjiadu Hydropower Station
乌江洪家渡水电站
1.
The excavated side height at the left abutment of Wujiang Hongjiadu Hydropower Station is 310 m, the highest one in water conservancy and hydropower construction history of China.
乌江洪家渡水电站左坝肩高边坡开挖高度 310m ,是中国水利水电工程史上开挖最高的边坡 ,该边坡的稳定问题众所瞩目 ,文章采用弹塑性有限元数值模拟方法对左坝肩高边坡施工期岩体应力应变状态进行分析研究 ,从而对左坝肩高边坡的稳定性进行评
4) concrete face rockfill dam
面板堆石坝
1.
Study on creep mechanism and long-term deformation prediction for high concrete face rockfill dam;
高混凝土面板堆石坝流变机理及长期变形预测
2.
New concept of design for high concrete face rockfill dams;
高混凝土面板堆石坝设计理念探讨
3.
Discussion on arrangement of monitoring instruments at concrete face rockfill dams;
关于混凝土面板堆石坝监测仪器布置的探讨
5) CFRD
面板堆石坝
1.
New Engineering Construction Technology of CFRD Performed in Gongbo Gorges of Yellow Rive;
黄河公伯峡面板堆石坝工程施工新技术的应用
2.
Dynamic response analysis of CFRD with extrusion-sidewall structure;
采用挤压式边墙结构的面板堆石坝的动力反应分析
3.
Statistical Analysis for the Settlement Monitoring Data of Baixi CFRD;
白溪面板堆石坝沉降监测资料统计分析
6) concrete facing rockfill dam
面板堆石坝
1.
Analysis and treatment of the crack causes of concrete facing rockfill dam of the Nanche Reservoir;
南车水库混凝土面板堆石坝面板裂缝成因分析及处理
2.
Study on and application of new sealing structure in the peripheral joints of Qinshan concrete facing rockfill dam;
芹山面板堆石坝周边缝新型止水结构研究与应用
3.
Application of natural diluvial deposit in the bedding materials of concrete facing rockfill dam;
天然洪积堆积物在面板堆石坝垫层料中的应用
补充资料:石龙坝水电站
中国第 1座水电站。位于云南省昆明市郊滇池出口的螳螂川的石龙坝。由云南地方当局倡议,官商集资于1912年建成,由跃龙电灯公司管理。石龙坝水电站由德商礼和洋行承包设计和施工,设计水头15米,为引水式水电站。水轮发电机组由西门子洋行制造。电站相继建有3座厂房。一厂于1910年7月开工,安装两台240千瓦机组,1912年4月开始发电。通过30公里长的22千伏输电线路(中国架设最早的中压架空输电线路)将电能输送至昆明市万钟街变电所,供昆明市区用电。1932和1937年,一厂又先后增装两台 720千瓦机组。二厂于1924年开工,安装2台276千瓦机组,1926年开始发电。1935年又安装1台448千瓦机组。三厂建于1943年,由一厂拆下的2台240千瓦机组经修复后装于该厂。到1943年,电站共装7台机组,总容量达2920千瓦。石龙坝水电站在中国水电发展上起过一定作用。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。