说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 洪家渡水电站面板堆石坝
1.
Dam Body Filling Design by Stages for Concrete Face Rock-fill Dam of Hongjiadu Hydropower Station
洪家渡水电站面板堆石坝坝体填筑分期设计
2.
Construction of impervious wall in CFRD of Laodukou Hydropower Station
老渡口水电站面板堆石坝防渗墙施工
3.
Engineering Characteristics of Dam-body Spillway of Rockfill Dam with Concrete Face Slab for the Tongbai Pumped Storage Power Station
桐柏抽水蓄能电站面板堆石坝坝身溢洪道工程特点
4.
Application of impact roller compaction technology to Hongjiadu concrete face rockfill dam
冲碾压实技术在洪家渡面板堆石坝上的应用
5.
Rockfill dam with face slab construction of Lianhua water power station
莲花水电站面板堆石坝坝体填筑施工
6.
Structure design of river hydropower dam concrete-faced rockfill dam
小河水电站砼面板堆石坝坝体结构设计
7.
Water Sealing Engineering for Surrounding Slots of Face Rockfill Dam at Qinshan Hydropower Station
芹山水电站面板堆石坝周边缝止水施工
8.
Design and Construction Technology of Concrete Facing Rockfill Dam in the Gongboxia Hydropower Project;
公伯峡水电站混凝土面板堆石坝设计与施工
9.
Design of the Monitoring of Face Rockfill Dam in Zecheng Xi'an Hydropower Station in Shanxi Province
山西省泽城西安水电站面板堆石坝的监测设计
10.
Calculation of the Concrete Facing Rockfill Dam of Sanjiangkou Hydropower Station of Amojiang River
阿墨江三江口水电站混凝土面板堆石坝坝体计算
11.
Core Rock-fill Dam Construct-Planning Introduction of Nuozhadu Hydropower Station
糯扎渡水电站心墙堆石坝施工规划简介
12.
A Study on the Suitability of Building the High Rockfill Dam in the Underside Dam Site of the Changheba Hydroelectric Station in Daduhe River;
大渡河长河坝水电站下坝址建高(堆石)坝适宜性研究
13.
Optimization and organization on excavation and construction of the left abutment of Hongjiadu Hydropower Station
洪家渡水电站左坝肩开挖施工优化与组织
14.
Discussion on the Main Technological Problems of the Concrete Face Rockfill Dam for Jiemian Hydropower Station;
街面水电站混凝土面板堆石坝主要技术问题探讨
15.
Study on Eearth-rock Transportation and Dam Filling Schedule of High Core Rock Fill Dam for Nuozhadu Hydropower Station;
糯扎渡水电站心墙堆石坝土石方调运及坝体填筑进度分析
16.
3-D Finite Element Analysis of CFRD Used in Pumped-Storage Power Station
抽水蓄能电站混凝土面板堆石坝三维有限元分析
17.
Construction of Rockfill Mixed Dam with Reinforced Concrete Face Slab for the Upper Reservoir of Jiangsu Yixing Pumped Storage Power Station
江苏宜兴抽水蓄能电站上库面板堆石混合坝建设实践
18.
Characteristics Research of the Spillway Discharge on Overflow Concrete Face Rockfill Dam;
溢流式面板堆石坝坝体溢洪道泄流特性研究