1) Gaobazhou Project
高坝洲工程
1.
Test study on polymer cement mortar for anti-seepage in RCC dam section of Gaobazhou Project;
高坝洲工程RCC坝段防渗聚合物砂浆试验研究
2) Gezhouba Project
葛洲坝工程
1.
Study on Capacity Extension Scheme of Gezhouba Project;
葛洲坝工程扩机方案研究
2.
Twice careful decision-making by Premier Zhou on Gezhouba Project
周恩来对葛洲坝工程的两次慎重决策
3) High Dams
高坝工程
1.
The Finite Element and Genetic Algorithm Used for Seepage Inverse Problem of High Dams;
采用遗传算法和有限元法进行高坝工程渗流反问题研究
4) dam heightening works
大坝加高工程
1.
Rope-saw cutting to restore transverse joints before Danjiangkou dam heightening works;
丹江口大坝加高工程中用绳锯切割恢复横缝施工
2.
The comprehensive development planning of Danjiangkou Hydraulic Project,general layout of the first-phase project and the main hydraulic structures are described;the second-phase dam heightening works and the major social-economic benefits of Danjiangkou Hydraulic Project are described emphatically.
介绍了丹江口水利枢纽的开发规划初期工程的枢纽布置及主要建筑物;重点介绍了续建计划中的大坝加高工程及水利枢纽主要的社会经济效益。
5) foundation engineering geology for high dam
高坝坝基工程地质
1.
It introduces, on the basis of summing up the experience, the study status quo, contents, methods and evaluation principles of the main engineering geological problems that are commonly encountered in the construction of hydropower projects in China, such as local tectonic stability, the foundation engineering geology for high dam, the stability of surrounding rocks of underground works and the.
对中国水电工程建设中常见的区域构造稳定、高坝坝基工程地质、工程高边坡稳定、地下工程围岩稳定和岩溶渗漏等主要工程地质问题的研究现状、内容、方法和评价原则,作了总结经验性的介绍。
6) Gaobazhou RCCD
高坝洲RCC坝体
补充资料:葛洲坝—上海±500kV直流输电工程
葛洲坝—上海±500kV直流输电工程
Gezhouba-Shanghai±500k V Direct Current Transmission Project
葛洲坝一上海士SOOkv直流输电工程(Gezhouba一Shanghai士SOOkV Direet Cur-rent Transmission Project)中国第一个大容量、长距离超高压直流输电系统。其线路西起葛洲坝水电站的宋家坝变电所,东至华东电力系统上海市南桥换流站(见彩图插页31页)。线路全长1 046k。,输电电压土5。。kv,输送功率120方kw。线路由中国设计和施工,换流站设备由国外引进。线路第一极(极工) 逆变站(南桥)溉李渔思冷笋国┌──┬─┐┌─┬─┐│一艺│3 ││压│石│└──┴─┘└─┴─┘┌──┬─┐ │一艺│么│┌─┬─┐│ │ ││又│夕│└──┴─┘└─┴─┘┌──┬─┐ │乙 │飞│┌─┬─┐└──┴─┘│压│巨│ └─┴─┘┌──┬─┐ │乙 │玉│┌─┬─┐└──┴─┘│叮│己│ └─┴─┘ 葛一上线两端直流输电系统示意 1.6脉冲换流器2.换流变压器3.平波电抗器4.直流滤波器5.交流滤波器6.无功补偿电容器双极华东每侧双避工况系统V超地放类试哥)于扮89年5月调试,9月正式投人运行。极五希于199。年8月投运,葛一上线是华中电力系统泪电力系统间的强大联络线。线路采用拉线式铁塔支撑一极导线。导线采用4分裂导线束,塔顶采月雷线保护。当因故障或一侧停电检修时,单极运衣的输送功率为6。万kw。葛一上线两端直流输庄示意如图。 葛一上线调试过程中进行了中国首次士5001高压直流输电线路现场接地故障试验,强大的刘电电孤见彩图插页第32页。世界各国至今未见追验报道口〔林华咨朱家“
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条