说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 高坝洲电厂
1.
Analysis and Countermeasure of the Faults of the Stability Control Equipment in Gaobazhou Hydropower Plant;
高坝洲电厂安稳装置异动分析与对策
2.
Reform on upper guide bearing supports of generator No.2 of Gaobazhou Hydropower Plant
高坝洲电厂2号机组上导瓦支撑改造
3.
Improvement on fixing seal strips of hydroturbine guide-vane of Gaobazhou Hydropower Plant
高坝洲电厂水轮机导叶密封安装方法改进
4.
Implementation of New Efficient Operation Management Mode in the Gezhouba Hydropower Plant
新型高效运行管理模式在葛洲坝电厂的实施
5.
Methodology Study and Practices of Optimal Maintenance for Gezhouba Hydro Power Plant;
葛洲坝电厂最优维护方法研究与实践
6.
Realization of Primary Frequency Regulation for Generator Units in Gezhouba Hydropower Plant
葛洲坝电厂机组一次调频功能的实现
7.
Analysis of Energy Loss and Economic Operation for Main Transformer in Gezhouba Power Plant
葛洲坝电厂主变变损和经济运行分析
8.
Study on the Application Research of High Voltage Reactor Oil Dissolved Gases Monitoring and Fault Analysis Technology in Gezhouba Power Plant;
葛洲坝电厂高压电抗器油中溶解气体监测与故障诊断技术应用研究
9.
High Gravity Dam Baozhusi Hydropower Station Research on Combined Functions of Power Plant with Dam;
宝珠寺水电站高重力坝厂坝联合作用研究
10.
Study on Multi-industry Development Strategy for Gezhouba Hydroelectric Power Plant;
葛洲坝电厂多种经营产业集团化发展战略
11.
Large-size bolts assembling and disassembling in hydroturbine maintenance of Gezhouba Hydropower Plant
葛洲坝电厂水轮机检修中的大型螺栓拆装
12.
The Coordinate Flaw Solution of Gezhouba Hydropower Plant AGC and Primary Frequency Modulation
葛洲坝水电厂AGC调节与机组一次调频配合缺陷的解决方法
13.
Probe and practice about separation of technical management from maintenance work in Gezhouba Hydropower Plant
葛洲坝电厂“技术管理与检修作业分离”模式的探索与实践
14.
Trial and Application of Primary Frequency Regulation Function for Hydro-turbine Generator Unit in GZB Hydropower Plant
一次调频功能在葛洲坝电厂水轮机组的试验与应用
15.
Application of Programmable Computer Controller in Reformation of Gezhouba Hydro-plant Governor
PCC可编程计算机控制器在葛洲坝水电厂调速器改造中的应用
16.
To Built Added Sub dam by Ash in Tongguanxi Ash Pond in Douba Power Plant
豆坝电厂铜罐溪灰场用灰渣加筑子坝
17.
Stability and Risk Analysis of Powerhouse Slope of Nanya River Yaoheba Hydroelectric Station;
南桠河姚河坝水电站厂房高边坡稳定及风险分析
18.
Analysis on Construction Difficulties of High Slope Excavation at Intake of Underground Powerhouse at Xiangjiaba Hydropower Station
向家坝电站地下厂房进水口高边坡开挖施工难点剖析