1) navigation condition in construction
施工通航条件
2) navigation in the course of construction
施工通航
1.
This paper introduces some resarch results on sediment model experiment of navigation in the course of construction.
介绍了施工通航泥沙模型的研究成果,包括施工期坝区河段冲淤变化规律、临时船闸引航道泥沙淤积形态、淤积分布、淤面标高、回淤速度、碍航淤积量、淤沙级配以及淤积对明渠和临时船闸通航条件的影响等,并提出了相应的改善措施。
3) navigation condition
通航条件
1.
Study on operational mode of TGP lock and navigation conditions during cofferdam retaining water;
三峡永久船闸围堰期运行方式及其通航条件研究
2.
Research on navigation conditions downstream TGP during its flood-discharge;
三峡工程泄洪对下游通航条件影响的研究
3.
Research on navigation condition and the configuration of diversion channal of Caojie hydro-junction in Jialing river
嘉陵江草街枢纽通航明渠体型及通航条件研究
4) Navigable condition
通航条件
1.
Study on navigable condition in the intermediate channel between the two ship lifts of Longtan Power Station;
龙滩升船机中间渠道通航条件试验
2.
From the results of model tests, width of the entrance,structural pattern of the breakwater and the relation between water depth and navigable conditions at the entrance are described and the main factors influencing navigable conditions at the entrance is analyzed.
根据模型试验结果 ,描述了口门宽度、防波堤堤身结构型式以及水深与口门通航条件的关系 ,分析了影响港口口门通航条件的主要因素 ,并根据自航船模的试验情况初步提出了船舶进出口门的流速限值。
3.
So it must further demonstrate navigable condition of the key lock by ship model testing,and verify the reliability of navigable condition in the key lock.
鉴于富金坝电航工程发电厂和通航船闸及上下游引航道利用露水垭垭口布置,通航条件较为复杂,因此在初步设计阶段,通过船模试验进一步论证枢纽船闸的通航条件,检验船舶进出船闸的可靠性。
5) navigation conditions
通航条件
1.
Study on construction period navigation conditions to Changshou Railroad Bridge of the Yangtzi River;
渝怀铁路长寿长江大桥施工期通航条件研究
2.
Based on the physical model and model-ship test, this paper studies the navigation conditions of Naji Waterway when arranged at left and right banks, and engineering measures for improving the navigation conditions.
通过物理模型并结合船模试验研究,对那吉航运船闸布置在左、右岸两个方案进行了通航条件的试验研究,同时采取工程措施改善其通航条件。
3.
Through model test, this paper analyzed the influence of non-steady current produced by the Three Gorges Power Station at the time of flood discharge and daily regulation on the navigation conditions of the reach between the Two Dams.
通过模型试验研究,分析三峡电站在泄洪和日调节时产生的非恒定流对两坝间通航条件的影响。
6) construction condition
施工条件
1.
Simulation of thermal stress of Longtan RCCD based on construction conditions
基于施工条件的龙滩碾压混凝土重力坝温度应力仿真分析
2.
The fabrication of unit of grid is mainly introduced as well as construction method of accumulative slip with multi-support points,which resolve the installation questions of grid structure under limited construction conditions.
对现场施工条件进行了分析,从理论和实践两方面对网架的安装技术和方法进行了论述,重点提出了网架的立体单元制作、高空多支点累积滑移的施工方法,解决了现场施工条件限制情况下网架的安装问题。
3.
The design and construction conditions of the general bulk cargo berth of Dalianwan Bay in Dalian Port,as well as the optimal selection of design proposals and comparison of the construction cost are described.
介绍大连港大连湾通用杂货泊位工程设计和施工条件,在此基础上介绍护岸和防波堤的设计方案优选及该工程的造价比较。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条