1.
Construction of Dragging Pipe under Complex Condition of Non-excavation
复杂施工条件下非开挖拖拉管的施工
2.
STUDY ON THE INFLUENCE OF CONSTRUCTION CONDITION ON THE CHOICE OF THE CHIMNEY LINING
施工条件对烟囱内衬选型的影响分析
3.
MONITORING OF TUNNEL CLEARANCE DISPLACEMENTS UNDER CONDITION OF TBM CONSTRUCTION
TBM施工条件下隧道净空位移监测
4.
Conditions of Work and Welfare Facilities Branch
工作条件和福利设施处
5.
The Research of Claims Based on FIDIC Contract Condition;
基于FIDIC施工合同条件的工程索赔研究
6.
Management of Engineering Project under the Conditions of Contract for Construction in FIDIC;
FIDIC施工合同条件的工程项目管理
7.
The Contrast between the Old and New Civil Construction Contract Conditions of FIDIC;
新旧版FIDIC《土木工程施工合同条件》对照
8.
Building hoist--Specification
GB/T10054-1996施工升降机技术条件
9.
Development Conditions and Measures for Ha-Da-Qi Industrial Corridor in Heilongjiang Province;
哈大齐工业走廊发展条件及措施分析
10.
Study on Construction Process of Shallow Buried Tunnel in the Soft Surrounding Rock
软弱围岩条件下的浅埋隧道施工研究
11.
Water Inrush Prevention in Vertical Shaft Construction under Special Water Bearing Condition
特殊赋水条件下立井施工防治水技术
12.
Construction Technology of Limestone Soil in Low Temperature
低温条件下石灰稳定土施工技术研究
13.
The Engineering Techniques for ADSS Optic cable under Special Over-crossing
ADSS光缆在特殊跨越条件下的施工技术
14.
Adverse Geological Conditions' Effect and Analysis on Tunnel Boring Machine Construction
不良地质条件对TBM施工的影响与探讨
15.
On construction treatment measures of bored piles in volcanic lavas
谈溶岩地质条件下钻孔灌注桩的施工处理措施
16.
Quality Control Measures in Beam Prefabrication under High Temperature
高温条件下梁体预制混凝土施工质量控制措施
17.
On the exploration of typical karst treatment measure in tunnel construction under complex geological condition
复杂地质条件下隧道施工中典型岩溶处理措施
18.
Management of Working-day Claims for Construction Projects in FIDIC Construction Contracts;
建设工程在FIDIC施工合同条件下的工期索赔管理