说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 洞口段施工
1)  portal section construction
洞口段施工
2)  Construction of tunnel entrance
洞口施工
3)  Construction Technology of Tunnel Entrance
隧道洞口施工技术
4)  portal section
洞口段
1.
Construction of tunnel portal section in accumulative rock;
堆积体围岩中隧道洞口段修建技术
5)  culvert construction
涵洞施工
1.
Application of the push bench construction process in the culvert construction;
顶管施工法在涵洞施工中的应用
2.
Quality control of culvert construction on weak foundation;
软弱地基涵洞施工的质量控制
6)  tunnel construction
隧洞施工
1.
Development law of karst and influence on tunnel construction in marble region;
大理岩区喀斯特发育规律及其对隧洞施工的影响
2.
The application of NATM to Guan Yin Shan tunnel construction in Dongjiang-Shenzhen supply modification works;
“新奥法”在东江—深圳供水改造工程观音山隧洞施工中的应用
3.
Taking water diversion project in Ningbo city Baixi Reservoir as an example,the application of automatic pumping equipment in the lower broken rock,water-rich and full drainage tunnel construction costs is presented.
以宁波市白溪水库引水工程为例,介绍了自动抽水装置在降低破碎围岩、富水充分隧洞施工排水费用中的应用。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条