1) Left bank water retaining dam section
左岸挡水坝段
2) left bank plant section
左岸厂房坝段
1.
This paper gives a detail introduction of the temperature control and anti-crack measurement in the construction of LOT II A of the left bank plant section of the secondary phase of the Three Gorges Project.
文章主要论述三峡二期工程左岸厂房坝段ⅡA标段混凝土施工期温控及综合防裂技术措施。
3) permanent water plant on left bank of Three Gorges Dam
三峡大坝左岸永久水厂
1.
Application of computer supervision system to permanent water plant on left bank of Three Gorges Dam;
计算机监控系统在三峡大坝左岸永久水厂中的应用
4) abutment monolith
岸坡坝段
1.
The authors simulated the temperature field and stress field of riverbed monoliths and No6 abutment monolith in Jiangkou arch dam during the construction process by using SimuDam software and SAPTS software, which include a 2D FEM and a 3D FEM and were developed by IWHR.
用中国水利水电科学研究院开发的SimuDam程序和SAPTS程序,对江口拱坝的河床坝段及6#岸坡坝段的基础约束区,依据设计施工单位提供的气象资料、坝体混凝土和基岩材料参数以及坝体施工进度,对不同的温控方案,分别用二维与三维有限元进行了温度场及应力场的仿真计算。
6) left dam blocks
左联坝段
1.
Concrete construction of left dam blocks heightening of Danjiangkou Hydroproject;
丹江口工程左联坝段加高混凝土施工
2.
Concrete-supply line for construction of left dam blocks of Danjiangkou dam heightening works;
丹江口大坝加高工程左联坝段混凝土供料线的设计与应用
补充资料:拦水坝
1.拦截水流的堤坝。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条