1.
Temperature Control and Anti-crack Technique in the Construction of LOT II A of the Left Bank Plant Section of the Secondary Phase of the Three Gorges Project
三峡二期工程左岸厂房坝段ⅡA标段混凝土温控及防裂技术
2.
Dynamic Behavior and Earthquake Response of the Dam Section with Inserted Power Station of Fengshuba Dam
枫树坝坝内式厂房段的动力特性和地震反应
3.
An analysis of aseismic dynamic characteristic of workshop section in the Yangtse Gorges dam
三峡大坝厂房坝段结构抗震动力特性分析
4.
Study on Stability of Dam Body and Foundation on the Powerhouse in the Feilai Gorge Project;
飞来峡厂房坝段坝体及基岩稳定性研究
5.
Research on contact of powerhouse′s longitudinal joint of TGP
三峡工程厂房坝段纵缝接触问题研究
6.
Curtain Grouting Test at Underground Powerhouse at Right Bank of Xiangjiaba Dam
向家坝水电站右岸地下厂房帷幕灌浆试验
7.
Study on Dynamic Testing and Characteristics of Three Gorges Left Powerhouse;
三峡左岸电站厂房动态测试及动力特性研究
8.
Study on Water Seal Layout at the Power House Monolith Joint of Power Station in River Channel;
河床式水电站厂房坝段横缝止水布置形式研究
9.
Three-dimensional Seepage Analysis of Powerhouse Dam Section of Xixia Institute Anti-regulation Reservoir
西霞院水库电站厂房坝段三维渗流计算分析
10.
Finite Element Analysis of the Earthquake Resistance for the Riverbed-Hydropower Station
河床式水电站厂房坝段三维有限元抗震分析
11.
Dam block14 and its foundation of the Three Gorges Left-bank Hydropower Station are chosen as a key part for the safety monitoring system.
三峡大坝左厂14号坝段及其基础是三峡大坝安全监测系统选择的关键部位。
12.
According to presentations, the second phase project of the Three Gorges Project mainly includes bids such as the flood discharge dam, the factory protection dam and the factory buildings, etc.
据介绍,三峡工程二期工程主要包括泄洪大坝、厂房大坝及厂房等标段。
13.
Study on curtain grouting scheme and technology for construction of underground powerhouse on right bank of Xiangjiaba Hydropower Station
向家坝水电站右岸地下厂房施工帷幕灌浆方案与技术研究
14.
Dynamic Character Research and Earthquake Resistance Anlysis of the Plant Monolith in River Channel;
河床式水电站厂房坝段动力特性研究及抗震分析
15.
Analysis of rapid construction thermal control plans of RCC power house dam section of Jinanqiao hydropower station
金安桥水电站碾压混凝土厂房坝段快速施工温控方案分析
16.
Treatment of the cracks on the left pier of dam section No.49 of Yunfeng dam
云峰大坝49号坝段左闸墩裂缝处理
17.
Observation and Analysis of Seapage Around Abutment in Left Bank of Liujiaxia Dam
刘家峡大坝左岸绕坝渗流的观测与分析
18.
Dam Partition Temperature Control for Left Bank of Xiangjiaba Hydropower Station
向家坝水电站左岸坝体分缝温度控制研究