说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 岸坡坝段
1.
Experimental Study on Non-Cover-Weight Grouting at Bank-slope Monolith of Goupitan Hydropower Station
构皮滩水电站岸坡坝段无盖重灌浆试验研究
2.
Consolidation Grouting Test in Non Concrete Layer Foundation in Dam Section on Bank Slope of Goupitan Hydropower Station
浅析构皮滩水电站岸坡坝段无盖重固结灌浆试验
3.
Quantitative Evaluation of Bank Slope Stability along Lower Jinsha River from Xiangjiaba to Xiluodu;
金沙江下游(向家坝—溪落渡段)河段岸坡稳定性量化评价
4.
Analysis of Observation Data for Turning Section of Right Part of Danjiangkon Concrete Dam
丹江口混凝土坝右岸转弯坝段观测成果分析
5.
Property analysis on measured seepage of the right-bank dam foundation at Three Gorges Project
三峡工程右岸坝段实测坝基渗流性态分析
6.
Sensitivity analysis of contact grouting indicators in steep section of high arch dam
高拱坝陡坡坝段接触灌浆指标敏感性分析
7.
Application Spatial Variations in Slope of Deposit Body Located in Front of Xiao Wan Dam on Left;
小湾左岸坝前堆积体边坡的空间变异性研究
8.
Studying on the Stability of the High and Steep Rocky Slope at the Right Bank of Anterior Dam in Pubugou Hydraulic Power Station;
瀑布沟坝前右岸岩质高陡边坡稳定性研究
9.
Stability Study on the Right Bank Dam Crest Slope of Dagangshan Hydropower Station in Daduhe River
大渡河大岗山水电站右岸坝顶边坡稳定性研究
10.
The safety guarding web design and construction of high slope right bank of Changhe dam power station
长河坝电站右岸高边坡安全防护网设计与施工
11.
Presplit Blasting in Excavation of High Slope at Right Bank of Jinping I Hydropower Station
锦屏一级水电站大坝右岸高边坡预裂爆破施工
12.
Genetic Mechanism for the Old Landslide in Left Front of a Certain Hydroelectric Station Dam
某水电站坝前左岸古滑坡成因机制分析
13.
Study on Shaking and Jetting Reinforcement Technology in the Upstream Sand-Shell Slope of Andi Dam in Linyi City, Shandong Province;
岸堤水库心墙砂壳坝上游坝坡振冲加固技术研究
14.
Study on Stability of the Right High Slope and Dangerous Rock in the Dam Area of GuWa Hydropower Station;
古瓦水电站坝址区右岸高边坡及两岸危岩体稳定性研究
15.
Analysis on stability of left bank slope of Hechuan water diversion project
引沁入汾和川引水枢纽工程坝址区左岸岸坡稳定性分析
16.
Study on Structure Jointing of Ameliorating Temperature Stress Concentration in Steep Slope of High Arch Dam;
改善高拱坝陡坡坝段应力集中的结构分缝形式研究
17.
Simulating Analysis of Concrete Steep Slope Dam Thermal Stresses during Hyperthermia Seasons
高温季节浇筑陡坡坝段温度应力仿真研究
18.
Study on the Stability and the Measure of the Control of the Left Bank Abutment High Slope of the Jinanqiao Hydroelectric Power Station
金安桥水电站左岸坝肩高边坡稳定性与治理措施研究