2) water turbine-generator generator
水轮发电机机组
3) hydrogenerator unit
水轮发电机组
1.
Several technical problems of hydrogenerator unit of the Three Gorges Project;
三峡工程水轮发电机组若干技术问题
2.
The reason analysis of hydrogenerator unit self-rotation after stopping air brake quitting;
水轮发电机组停机制动风闸撤下后发生自转的原因分析
3.
This paper is directed against the reality problem that it is very difficult to measure the critical speed of the shaft system in a large scale hydrogenerator unit in operating.
针对大型水轮发电机组轴系临界转速难以实际测定的现实问题,从理论分析的角度出发,抓住水力机组轴系结构的基本特点,提出采用较为简单的模拟结构,试验研究水力机组轴系固有频率及其振型特征。
4) hydroelectric generating unit
水轮发电机组
1.
Research on vibration fault diagnosis of hydroelectric generating unit based on PNN;
基于PNN的水轮发电机组振动故障诊断
2.
Study on optimum start-up rule for hydroelectric generating units;
水轮发电机组最佳开机规律研究与实践
3.
In this paper,a novel simple controller design method for hydroelectric generating unit is described and applied in a high-order and non-minimumphase hydroelectric generating unit.
提出了一种简单新颖的水轮发电机组鲁棒控制器设计方法,并将其应用到一个高阶、非最小相位的水轮发电机组中。
5) hydroelectric generating set
水轮发电机组
1.
Extracting partial discharge signals of hydroelectric generating set based on empirical mode decomposition;
基于经验模态分解的水轮发电机组局部放电信号提取
2.
This paper probes into the causes and frequency of the vibration of hydroelectric generating set of Lijiaxia Hydropower Station form three aspects of the mechanics, electromagnetism and hydraulics, and advances some suggestions on carrying out the prototype test.
从机械、电磁和水力等3个方面对李家峡水电站水轮发电机组的振动原因及其频率进行了初步探讨,并提出了进行原型试验的建议。
3.
For simulating dynamic hydroelectric generating set easily and quickly,a new modeling method using Flowmaster2 soft is proposed.
按Flow-master2软件要求推导出了建立水电仿真系统过程中最关键部件水轮发电机组的数学模型,详细介绍建立其仿真模型的步骤和编程方法。
6) turbine generator unit
水轮发电机组
1.
Guide bearing erection and adjustment for suspended-type turbine generator unit;
悬吊型水轮发电机组导轴承的安装与调整
2.
An analysis was made on the operation experience,achievements and existing problem of low-head bulb turbine generator units in the Baishiyao Hydropower Plant.
分析了白石窑水电厂低水头灯泡贯流式水轮发电机组多年运行的经验、成绩以及存在的问题,通过与高水头水电厂(一般采用立式混流水轮发电机组)在经济、技术上进行对比,论述了低水头灯泡贯流式水轮发电机组的优点和缺点,认为在25 m水头以下灯泡贯流式机组有较好的技术、经济效益。
3.
With fault diagnosis of turbine generator unit vibration as the research object,the expert system based on neural network and in combination with the real machine test on Yanguoxia hydropower plant is presented in this paper.
本文介绍了以水轮发电机组振动故障诊断为研究对象,基于神经网络的专家系统的研究与实现。
补充资料:水轮发电机安装
水轮发电机安装
erection of hydrogenerator
shLJ一ILJn fod一onjl onzhuor〕g7k轮发电机安装(ereetion of hydrogenera-tor)水轮发电机部件在水电站内组装和调试的施工过程。包括定子装配与安装、转子装配、机架安装、推力轴承和导轴承安装、机组轴线检查和调整。 定子装配与安装小型水轮发电机的定子在制造厂装配成整体。大、中型水轮发电机定子受运输的限制,工厂分瓣制造,在现场组装并嵌装合缝线棒。当发电机的定子采取在现场整体装配叠片嵌线时,可提高定子的圆度和刚度,避免铁芯合缝产生振动和噪声。 (l)分瓣定子装配。包括分瓣定子吊人机坑组装、调整定子铁芯圆度找正中心、嵌装合缝线棒、线棒端接头焊接、绝缘介电强度试验。 (2)定子现场整体装配。包括机座组装焊接、定位筋焊接、叠压硅钢片、嵌装线棒、端部接头焊接、绝缘介电强度试验。现场整体装配定子,一般是在安装间进行,如因场地条件限制也可在机坑中进行。装配前首先要制订好装配措施,布置好定子基础板支墩。在待组装的定子外壳中心位置设立测量用中心柱,并调整其垂直度偏差符合测量精度要求。定子机座圆度、定位筋间距和半径偏差,要符合设计要求。叠装铁芯要注意清洁整齐,铁芯硅钢片要分段压紧。同时检查铁芯的圆度、垂直度和波浪度等,要符合工艺导则的规定。全部铁芯压紧后,必须检验压紧螺杆的紧度。 (3)定子铁损试验。在装配好的定子铁芯圆周上,缠绕励磁绕组和测量绕组.用50Hz交流电源使铁芯产生约IT左右的磁感应强度。在试验的90min内,测量绕组的电压、电流,计算单位铁损值并检查铁芯各部温升情况和最大最小温度差,温度差应符合规程规定。定子铁芯做完铁损试验后,在热状态下再次旋紧螺杆压紧铁芯。 (4)定子嵌装线棒。一般是在机坑中进行。线棒绝缘表面要清洁完好,线棒与线槽配合应严密。嵌装下层线棒和上层线棒以后,按标准分别做工频交流耐压试验。 (5)端部接头焊接。有银铜(硬)焊和锡(软)焊两种。银铜焊工艺,要求接头导线和连接板接触平整.不许有较大的间隙;锡焊工艺,要求接头导线和连接套先挂好一层薄的焊锡,装配严实。接头一般用工频或中频交流感应加热焊接。锡焊下端接头一般用灌注法。 转子装配水轮发电机转子一般在安装场装配,装配场地设有支持转子支臂和磁扼的支墩。转子装配.包括竖轴和组装轮辐、装压磁扼铁片、热打键、挂装磁极和干燥、绝缘介电强度耐压试验、转子吊装。 (1)竖轴和组装轮辐。调整轴的垂直度达到0.()2mm/m,竖立于基础上,这是装配转子的基准。大型发电机转子中心体一般是轴的一部分,并具有推力轴承转动体(推力头),其轮辐一般用螺栓连接于中心体上。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条