1) unit of pump-turbine-generator
水泵水轮-发电电机组
2) water turbine-generator generator
水轮发电机机组
3) hydrogenerator unit
水轮发电机组
1.
Several technical problems of hydrogenerator unit of the Three Gorges Project;
三峡工程水轮发电机组若干技术问题
2.
The reason analysis of hydrogenerator unit self-rotation after stopping air brake quitting;
水轮发电机组停机制动风闸撤下后发生自转的原因分析
3.
This paper is directed against the reality problem that it is very difficult to measure the critical speed of the shaft system in a large scale hydrogenerator unit in operating.
针对大型水轮发电机组轴系临界转速难以实际测定的现实问题,从理论分析的角度出发,抓住水力机组轴系结构的基本特点,提出采用较为简单的模拟结构,试验研究水力机组轴系固有频率及其振型特征。
4) hydroelectric generating unit
水轮发电机组
1.
Research on vibration fault diagnosis of hydroelectric generating unit based on PNN;
基于PNN的水轮发电机组振动故障诊断
2.
Study on optimum start-up rule for hydroelectric generating units;
水轮发电机组最佳开机规律研究与实践
3.
In this paper,a novel simple controller design method for hydroelectric generating unit is described and applied in a high-order and non-minimumphase hydroelectric generating unit.
提出了一种简单新颖的水轮发电机组鲁棒控制器设计方法,并将其应用到一个高阶、非最小相位的水轮发电机组中。
5) hydroelectric generating set
水轮发电机组
1.
Extracting partial discharge signals of hydroelectric generating set based on empirical mode decomposition;
基于经验模态分解的水轮发电机组局部放电信号提取
2.
This paper probes into the causes and frequency of the vibration of hydroelectric generating set of Lijiaxia Hydropower Station form three aspects of the mechanics, electromagnetism and hydraulics, and advances some suggestions on carrying out the prototype test.
从机械、电磁和水力等3个方面对李家峡水电站水轮发电机组的振动原因及其频率进行了初步探讨,并提出了进行原型试验的建议。
3.
For simulating dynamic hydroelectric generating set easily and quickly,a new modeling method using Flowmaster2 soft is proposed.
按Flow-master2软件要求推导出了建立水电仿真系统过程中最关键部件水轮发电机组的数学模型,详细介绍建立其仿真模型的步骤和编程方法。
6) turbine generator unit
水轮发电机组
1.
Guide bearing erection and adjustment for suspended-type turbine generator unit;
悬吊型水轮发电机组导轴承的安装与调整
2.
An analysis was made on the operation experience,achievements and existing problem of low-head bulb turbine generator units in the Baishiyao Hydropower Plant.
分析了白石窑水电厂低水头灯泡贯流式水轮发电机组多年运行的经验、成绩以及存在的问题,通过与高水头水电厂(一般采用立式混流水轮发电机组)在经济、技术上进行对比,论述了低水头灯泡贯流式水轮发电机组的优点和缺点,认为在25 m水头以下灯泡贯流式机组有较好的技术、经济效益。
3.
With fault diagnosis of turbine generator unit vibration as the research object,the expert system based on neural network and in combination with the real machine test on Yanguoxia hydropower plant is presented in this paper.
本文介绍了以水轮发电机组振动故障诊断为研究对象,基于神经网络的专家系统的研究与实现。
补充资料:水轮发电机组调峰
水轮发电机组调峰
peak load regulation of water turbine generator set
shu一lunfadlonllzu tloofeng水轮发电机组调峰(peak load regufation ofwater turbine generator set)水轮发电机组对电力系统高峰负荷的增长量迅速做出响应的一种运行方式。由于昼夜用电负荷的不均衡性,电力系统负荷曲线形成高峰及低谷,在高峰时,要有机组解决高峰电力的裕要,保证电力系统的供电质量。电力系统调峰机组,可以用水轮发电机组、燃气轮机组或汽轮发电机组,但以水轮发电机组最为经济合适,这是因为水轮发电机组具有开机停机简单迅速,增减负荷速度快,以及水电成本低廉的缘故。 20世纪60年代以来,抽水蓄能电站的建设发展很快,其发电电动机组既能调峰,又能城谷,对电力系统负荷高峰低谷的调节,又多了一种手段,对于火电比重占绝对优势、水电比重小且调节性能又差的电网,尤为重要。 抽水蓄能电站吸取夜间电力系统负荷低落时的剩余电能进行抽水,使火电机组不必降低输出功率或部分停机,同时也改善了火电机组运行条件;在高峰时利用抽上去的水量来发电,以解决电力系统调峰的负荷增长量。所以,以火电机组为主的电力系统,要解决系统调峰问题,一个有效的途径是建设抽水蓄能电站。 随着火电厂和核电站比重进一步增长,电力系统供电负荷率越来越低,电力系统在午夜以后,即使火电出力尽量压低,发电容量仍会超出电力负荷的需要,出现剩余电能.而高峰时又缺乏调峰电力,因此,更需要发展抽水蓄能电站与日益增长的火电厂和核电站配合运行。所以,在70年代后期至今,一些工业发达国家,如日本,随着高效率大容量火电机组的建设,以及核电站的发展,更加需要建设大型抽水蓄能电站进行调峰和填谷;根据日本研究,认为在以火电机组及核电机组为主的电力系统中,需要建设占电力系统容量的10%~20%抽水蓄能电站与之匹配,是比较经济合理的。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条