说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水轮发电机组安装
1.
Specification for installation of hydraulic-turbine and generator units
GB8564-1988水轮发电机组安装技术规范
2.
Erection Technique of King Sized Metal Spiral Case
大型水轮发电机组金属蜗壳安装技术
3.
Installation method and structure characteristics of turbine-generator units for Pengshui hydropower station
彭水水电站水轮发电机组结构特点和安装方法介绍
4.
Installation Technique of Tube Pedestal of Large-capacity Bulb Tubular Hydro-generating Unit
大容量灯泡贯流式水轮发电机组管型座安装工法
5.
INSTALLING TECHNIQUE OF 50MW HYDRO GENERATOR WITH EVAPORATIVE COOLING IN POWER STATION
52.5 兆瓦蒸发冷却水轮发电机电站安装技术
6.
generating set, hydraulic turbine, direct current
水轮机直浪发电机组
7.
generating set, hydraulic turbine, alternating current
水轮机交流发电机组
8.
Adjusting Technique for the General Assembly of Three Gorges Super-huge Turbogenerator
三峡特大型水轮发电机组总装调整技术
9.
Installation of guidevane mechanism of hydro-turbines of Liushuping Hydropower Station
柳树坪水电站水轮机导水机构安装调整
10.
New Installation Technology of Bottom Ring for Hydro Turbine Water Distributor
三峡电站Alstom水轮机导水机构底环安装新工艺
11.
Experimental Study on Hydrogenerator Instable Running and Its Improvement Measures in Ankang Hydropower Station;
安康电厂水轮发电机组运行稳定性分析及改进措施研究
12.
Water in a stream is harnessed by building a dam and putting in turbines for water to tum.
河流里的水可以借助于建筑水坝,并安装上使水发电的水轮发电机而加以利用。
13.
1000 MW USC Turbine Erection in Taizhou Power Plant
泰州电厂1000MW超超临界机组汽轮机安装探讨
14.
Basic specifications of automatic control components(devices) and their related system for hydroturbine-generating sets
GB/T11805-1999水轮发电机组自动化元件(装置)及其系统基本技术条件
15.
Installing Analysis of Burying Part of Turbine in Hydrodynamic-power Station;
小型水电站水轮机埋设部件的安装分析
16.
Lubrication Performance Study on Guide Bearing for Hydropower Sets;
水轮发电机组水导轴承润滑性能分析
17.
Calculation of Unbalanced Electromagnetic Force for a Hydrogenerator Unit;
某水轮发电机组不平衡电磁力的计算
18.
Domestic Manufacture of Three Gorges Power Station 700 MW Hydro-generating Unit
三峡电站700MW水轮发电机组国产化实践