说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 三期土石围堰
1)  the third stage rockfill cofferdam
三期土石围堰
2)  The third-stage soil rock cofferdam
三期土石围堰工程
3)  Earth-rock cofferdam
土石围堰
1.
The blasting method for notch of the earth-rock cofferdam antiseepage wall at the second stage of chinese Three Gorges Project, the measurement results of water hammer wave are presented, the influential factors of affecting the intensity of water hammer wave are analyzed, the control opf explosive dose of notch and protection method are put forward.
概述三峡二期土石围堰防渗墙槽孔爆破方法 ,列出其水击波测试成果 ,分析影响水击波强度的因素 ,提出槽孔爆破药量控制和防护方法的建议。
2.
Dabu power-plant had been successful in applying anti-leakage new technology of high pressure spraying guniting for earth-rock cofferdam on the blanket of gravels, which shortened construction period with good anti-leakage effect and obvious economic benefit.
大埔水电站应用高压喷射灌浆防渗技术在砂砾石覆盖层上进行土石围堰获得成功。
4)  earth-rockfill cofferdam
土石围堰
1.
Anti-seepage technique for construction of upstream earth-rockfill cofferdams of Goupitan Hydropower Plant;
构皮滩水电站上游土石围堰防渗处理技术
2.
Application of controlled grouting to anti-seepage of earth-rockfill cofferdam;
控制灌浆技术在土石围堰防渗处理中的应用
3.
Anti-seepage construction of earth-rockfill cofferdam for Yinpan Hydropower Station
银盘水电站土石围堰防渗施工及评价
5)  embankment cofferdam
土石围堰
1.
Application of controlled curtain grouting impervious technology in embankment cofferdams;
控制性帷幕灌浆防渗技术在土石围堰中的应用
2.
The impervious technique of high-pressure gunite applied to stage Ⅰembankment cofferdam of the Three Gorges Project was introduced comprehensively.
对高压喷射灌浆防渗技术在三峡工程一期土石围堰中的成功应用作了全面的介绍,详细阐述了其施工布置、施工主要参数、施工程序和施工方法。
6)  earth rock cofferdam
土石围堰
补充资料:土石围堰


土石围堰
earth and rockfill cofferdam

dam)用土石材料修建的临时挡水建筑物(见施工围堰)。土石围堰的结构简单,可以就地取材,施工方便,在水利工程施工中被广泛采用。土石围堰又可分为土围堰,土石混合围堰,堆石围堰等。土围堰可采用各种土料填筑或冲填而成;土石混合围堰用土混合以块石碴填筑;堆石围堰则全部由石料堆筑,另设防渗体。它可以在流水中修建,适用于各种地基。但土石围堰工程量大,易沉陷变形,抗冲能力差,通常用于横向围堰。 土围堰按结构可分为均质土围堰、非均质土围堰,后者设有斜墙或心墙防渗。堰顶宽一般不小于3米,有时可视施工需要(如通行车辆)适当加宽。边坡根据填土料确定,迎水面边坡一般1:2.5一1二3.0;背水面边坡1:1 .75一l二2.5。在透水地基上要采用防渗措施。排水设施是土围堰重要组成部分,它对堰体稳定有利。迎水面水流流速大时,则需设置块石或卵漂石护坡。 土石混合围堰和堆石围堰的边坡坡度,应具有足够抗滑稳定性,一般上下游坡采用1:1 .8。水利枢纽中的土石坝,如果采用河床外隧洞导流方式,全断面截流的堰体往往较高,这样可将堰体作为坝体的一部分,如中国碧口水电站枢纽。但该结合部分的围堰质量应与大坝一致。防渗体与坝壳间,必须铺设反滤层,最小厚度不小于0.3米,设计中力求减少层次。堰体与岸边联接予以充分注意,以防接触面上发生渗漏。必要’时还可修成过水围堰。(葛文辉)tushi weiyan土石围堰(earth and roekfill eoffer-
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条