说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 关键路口
1)  key intersection
关键路口
1.
Firstly, the necessity and the threelayer system of traffic zones are stated, and the concepts of key intersection and gatheringdispersing intersection are put forward.
首先阐述了交通分区的必要性和三层交通分区体系,提出了关键路口和集散路口的概念。
2)  key interface
关键接口
1.
Some key interfaces in implementing process were introduced.
最后还介绍了在具体实施中应该注意的若干关键接口。
3)  critical path
关键路径
1.
The earned value analysis in project schedule based on critical path;
基于关键路径的项目进度挣值分析
2.
Workflow critical path algorithm based on activities;
基于活动的工作流关键路径算法
3.
The activities sequence in critical path of highway project network;
道路工程项目网络关键路径中的活动排序问题
4)  critical path
关键线路
1.
Convenient matrix calculation method for critical path in twin code network chart;
一种求双代号网络图关键线路的简便矩阵算法
2.
This paper analyzes the time-scaled network plan applied to confirm critical path,gain time factors,control network plan and so on.
就时标网络计划在工程中如何确定关键线路、分析工作时间参数、进行网络计划的控制等进行阐述。
3.
Based on the study of calculating approaches of fuzzy network,this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.
基于对模糊网络计算方法的研究,提出了新的网络参数计算和关键线路判断方法。
5)  critical path
关键路
1.
We know that the operation processing time length in a schedule can be calculated through critical path of the corresponding chart.
对于给定加工顺序的n个工件的排列排序,排序时间表长即任务的最后完工时间的计算可以通过与问题对应的有向图的关键路的计算得到。
2.
Proceed to the technique battlefield the test equipment reforms,increasing well-trained degree of the personnel,by using the concurrent technology and the critical path technolog.
改造技术阵地测试设备,提高操作人员的熟练程度,采用并行技术和关键路技术优化导弹测试流程,同时建立战时应急状态下的测试流程,特别是导弹批量测试技术的提出,将极大地提高导弹测试速度,缩短测试时间,为将来技术阵地的建设提供了建议,同时也对将来常规导弹的设计和研制提出了更高的要求。
3.
According to the characteristics of interval plan network,this paper introduces the concept of interval critical path(DBICP).
论文针对区间数计划网络的特点,提出了基于限制期约束的区间关键路(deadline basedinterval critical path,DBICP)的概念,通过相关定理的证明给出了求解DBICP的算法,该算法拓展了Stefan Chanas和Pawel Zielinski关于区间关键路问题的研究成果。
6)  critical path
关键路线
1.
Solve the critical path problem by the shortest path method;
用最短路径法求关键路线及其SAS的实施
2.
This paper focus on deploying resource,make use of the different completion probability of critical and un-critical path,the authors suggest a schedule optimization algorithm based on transferring resources from un-critical path to critical path purposely,and the result of applying the model shows that the method is practical for optimizing project schedule with resourc.
着眼于资源的调配,提出利用关键路线与非关键路线上完工概率的不同,有目的地将非关键路线上的资源调配到关键路线上进行进度计划优化的算法,并对该方法进行了算例说明,结果表明该法对资源约束下的工程项目进度计划优化具有实际意义。
3.
The limitation of the PERT in the planning of construction schedule is studied for two cases, where there are several critical paths, or the sub critical path is close to the critical path.
分析了施工进度计划中当出现多条 (期望 )关键路线及次关键路线和关键路线相接近时应用PERT存在的一些问题 ,指出了在计算完工概率时应用PERT的局限性 ;将多条 (期望 )关键路线及次关键路线和关键路线相接近的情况分为相关和非相关两种情形分别讨论 ,提出相应的完工概率的计算方法 。
补充资料:两路口镇

两路口镇地处川西平原西部郫县西。距成都市30公里,国道213线纵剖镇域,走马河流经镇区,镇内有2.1万亩耕地,有1.7万人口。镇域总面积24.7平方公里。境内粮田肥沃,沟渠纵横,气候温和宜人。 主要农土特产品有“永兴食用菌”、“东风牛角椒”和“黄龙红油菜”。年产量分别在1500吨,900吨,50吨,有各种名贵桩头盆景,苗木花卉,其占地320亩,特别是“永兴园”的“醒狮”盆景享誉昆明“世博会”。全年正种蔬菜1200亩,有着120木韭菜,大棚蔬菜40亩,小家禽出栏27万头,禽蛋120吨,生猪2.01万头。 两条成灌公路并行境内,交通非常便利,是重要的农副产品产地和集散地。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条