1) Ertan
二滩
1.
Distributing and Evolutive Trend of Geological Disaster in Ertan Reservoir;
二滩库区地质灾害分布规律及发展趋势分析
2) Ertan Project
二滩工程
3) Touersantan
头二三滩
1.
Study on the Sustainable Management Countermeasures of Touersantan Nature Reserve in Gansu;
甘肃头二三滩自然保护区可持续管理对策研究
2.
Research on Diversity of Vascular Plants in Touersantan Nature Reserve;
甘肃头二三滩自然保护区维管植物多样性调查
4) Ertan arch dam
二滩拱坝
1.
Feedback analysis of material parameters of Ertan arch dam and its foundation rock;
二滩拱坝及坝基材料参数反馈分析
2.
Feedback analysis on temperature field of Ertan arch dam in operation period;
二滩拱坝运行期坝体温度场反馈分析
3.
Design and optimization study of the dam safety monitoring on the Ertan arch dam;
二滩拱坝安全监测设计及优化研究
5) Ertan reservoir
二滩水库
1.
Sediment Trap of Ertan Reservoir and Its Effect on Sediment Budget of Jinsha River;
二滩水库拦沙作用及其对金沙江流域水沙变化的影响
2.
Ecosystem service valuation of Ertan Reservoir watershed in mitigating reservoir sand sedimentation
减轻二滩水库泥沙淤积的生态系统服务价值评估
3.
Field observation and analysis of water temperature distribution in front of dam and in outflow in Ertan Reservoir
二滩水库坝前及下泄水体水温分布现场观测与分析
6) Ertan Hydropower Plant
二滩电厂
1.
High Temperature Fault Analysis and Treatment for Industrial Gas System at Ertan Hydropower Plant;
二滩电厂工业用气系统高温故障分析与处理
补充资料:滨河二滩公园
沂河东岸滨河大道景观工程6.3km段——河东滨河二滩公园,占地面积约120万平方米。该工程自北向南依次设置科普广场、综合文化广场、滚水瀑布、康乐园、童趣园、小皇山植物观赏园、观瀑广场等八大景观节点,设计观景塔3处,观水台4处,巨石假山、草皮看台、各种球场、烧烤营、码头、钓鱼区、野外宿营基地、林荫广场、亲水栈桥等景点分布其中,形成水、岸、滩、路、堤、景等为一体的滨河公园景区。
工程总造价约1亿元,2005年9月1日开工,现已完成总工程量的95%以上,有望于9月30日前完成全段工程施工。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条