1.
SEISMIC HAZARD ANALYSIS OF THE ERTAN DAM SITE
二滩水电站坝区场地地震危险性分析
2.
Research on EHDC Marketing Tactics in Central China Electric Market;
二滩公司华中电力市场营销策略研究
3.
Appraisal on Supervision Work of Arch Dam Works of Ertan Hydropower Project;
二滩水电站拱坝工程监理工作后评估
4.
Development of Project Management and Greater Progress for Ertan Construction Consultation;
开发项目管理,做强做大二滩建设咨询
5.
Water temperature structure and influencing factors in Ertan Reservoir
二滩水库水温结构及其影响因素研究
6.
SEISMIC INVESTIGATION OF UPPER CRUST STRUCTURE IN ERTAN AREA, YALONGJIANG RIVER
用人工地震探测雅砻江二滩地区地壳上部结构
7.
Ertan hydropower station is the first power station built on Yalong River.
二滩水电站是雅砻江梯级开发的第一个水电站。
8.
DISCING PHENOMENON OF THE DRILLHOLE CORE AT ERTAN DAM SITE AND ANALYSIS OF ITS FRACTURE MECHANISM
二滩坝址岩心裂饼现象及其断裂破坏机制
9.
ESTIMATION OF STRONG GROUND MOTION FOR THE ERTAN DAM REGION
对二滩水电站坝区场地地面运动的估计
10.
Supervision on Installations of Gates and Hoists in te Bid Ⅱ Project at the Ertan Hydropower
二滩水电站Ⅱ标工程闸门与启闭机的安装监理
11.
A Study for the Effect of Er'tan Hydropower Project on the Ecological-Geological Environment;
二滩水电工程对库区生态地质环境影响的探讨
12.
Mid-Long Runoff Intelligent Forecasting System of Ertan Power Station;
二滩水电站中长期入库径流智能预测系统
13.
Research on the AGC System of Computer Supervision and Control System of Ertan Hydropower Station;
二滩水力发电厂计算机AGC控制系统研究
14.
Practice and Consideration of Ertan Hydropower Station Construction Project Management;
二滩水电站建设项目管理的实践与思考
15.
Performance of International Procurement Contract for Electrical and Mechanical Equipment at Ertan Hydropower Station;
二滩水电站机电设备国际采购合同的执行
16.
Modal parameter identification of Ertan arch dam from strong earthquake records
基于强震记录的二滩拱坝模态参数识别
17.
Study on the Turbine Operation of Ertan Hydropower Station Lowering Reservoir Water Level during Low Water Period
二滩水轮机枯水期降低水库水位运行研究
18.
" Fur--Sheep kivskin,sheep lambskin"
GB/T14629.3-1993裘皮滩二毛皮、滩羔皮