说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 接触网受电
1)  overhead current collection
接触网受电
2)  OCS and pantograph
接触网受电弓
1.
The paper describes the composition, main functions and characteristics, key technologies and commissioning of dynamic OCS and pantograph real time video supervision system for OCS of electrified railways, illustrates its advantages in technology and application, It becomes a new technical supervising method for electrified railways.
本文对电气化铁道接触网受电弓动态实时视频监控系统的组成、主要功能和特点、关键技术、系统调试进行了介绍,并且阐述了其先进性与实用性,为电气化铁道提供了一种全新的科技手段。
3)  pantograph/catenary
受电弓/接触网
1.
Research on mixed dynamic simulation for the pantograph/catenary system;
受电弓/接触网半实物半虚拟混合模拟系统的研究
4)  Pantograph sliding block-contactwire
受电弓滑板-接触网导线
5)  overhead contact line power supply
接触网受流
6)  eclectrified overhead contact line
电接触网
补充资料:厂用电受电


厂用电受电
energizing of auxiliary power system

chongyongd一on sho一Jd一on厂用电受电(energizing of auxiliary powersystem)机组附属设备安装完毕后需通电试运行,所需厂用电源由外部供给,因此厂用电受电是调试工作开始的标志。 受电步骤新建电厂先由电力系统向变电站供电,再依次对高压起动/备用变压器、3~10kv厂用配电装置、厂用工作变压器及380V配电装置供电。扩建电厂因高压起动/备用变压器已经投人运行,故可利用它的电源对扩建的厂用配电装置等供电。 调试项目主要有:①用额定电压依次对空载线路、变电站母线、隔离开关、断瘩器、互感器、变压器及厂用配电装置等进行冲击合闸试验。有条件时.冲击合闸前应先进行递升加压试验。升压过程中注意检查各设备有无放电声及短路现象,发现问题及时处理后再进行升压。②检查三相电压应平衡,相序应正确,各段母线的相位彼此应一致。对配电装置供电时,有时会由于母线电容和与母线连接的电磁式电压互感器的电感相互作用而出现铁磁谐振,此时相电压升高,中性点明显位移。为消除谐振可在电压互感器的剩余电压绕组处并联电阻以去振。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条