1) segment installation
节段梁拼装
1.
Some construction technics of concrete beam bridges in segment installation have been discussed in this paper,combined with the construction of prestressed boxing bridges and the handling of the bridging machines in sifeng cloverleaf junction.
结合四丰立交1号匝道工程施工中的预应力箱形梁桥节段梁拼装施工和架桥机的使用,探索了混凝土梁桥节段梁拼装的主要施工工艺,并就可能出现的一些问题进行分析,提出预防措施。
2) segmental assembling
节段拼装
1.
In this paper mainly analyzes and interpretes the construction method,process,procedure of segmental assembling of traveling trestle bridge fabrication machines.
本文主要对移动支架造桥机节段拼装施工方法、工艺、流程等进行分析和阐述。
3) segment consolidation method
节段拼装法
6) large tonned segment splice