1.
Review of Segmental Assembling Construction Technique of Mobile Support
移动支架节段拼装施工技术方法综述
2.
Construction technology of box-girder segment bricolage of traversing carriage bridge fabrication machine
移动支架造桥机箱梁节段拼装施工技术
3.
Cable installation for reinforced concrete box arch bridge of Liuguihe large Bridge
六圭河大桥钢筋混凝土箱形拱桥多节段缆索吊拼装施工技术
4.
Study on Construction Technology for Pre-fabricated Segmental Box Girder Cantilever Erection in Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装施工技术研究
5.
Method and technique of segmental prefabrication, transfer gantry hoisting, splicing on arch timbering in construction of Xinyang Shihe River Bridge are introduced.
介绍信阳狮河大桥采用节段预制,龙门桁车提运,拱架上拼装等施工方法和施工工艺。
6.
Comprehensive Application of Construction Techniques for Segmental Precasting and Cantilever Assembling to Bridge Works
节段预制、悬臂拼装工艺在工程中的综合运用
7.
Construction Technology for Beams of Steel Box Girder and Site Assembly of the Closure Segment
钢箱梁横梁及合龙段现场拼装施工技术
8.
Construction Techniques for 60 m Reinforced Concrete Assembling-type Arch Bridge
60m跨钢筋混凝土拼装式拱桥施工工艺
9.
Alignment Control for Short-line Precast Segmental Bridges
短线法节段预制拼装桥梁线形控制探讨
10.
Seismic Performance Analysis of a Continuous Girder Bridge with Precast Segmental Bridge Columns Using Match-cast Dry Joints
干接缝节段拼装桥墩连续梁桥地震反应分析
11.
Seismic Analytical Model of Segmental Bridge Column with Match-cast Epoxy Joints
胶接缝连接的节段拼装桥墩抗震分析模型
12.
Recall & Development and Outlook of the Railway Bridge Segments Assembled Machine
铁路桥梁节段拼装造桥机回顾、发展与展望
13.
On Box Girder Precast Segment Assembling by Short-line Method & Alignment Control Technological Principle
短线法箱梁节段预制拼装及线形控制技术原理
14.
Study on Construction Control of Cantilever Erection Continuous Curved Girder Bridge;
悬臂拼装曲线连续梁桥施工控制研究
15.
Construction Techniques for Assembling and Erecting Steel Truss Girder under Water with the False Work Method
膺架法拼装架设水中钢桁梁施工技术
16.
Study on Construction Technology of Box Girder Segment s Stub Matching Precast and Cantilever Erection;
箱梁短线匹配预制及悬臂拼装施工技术研究
17.
Study on Construction Geometry Control of Prefabrication Based on Short-Line Method and Cantilever Erection Continuous Girder Bridge;
短线预制悬臂拼装连续梁桥施工线形控制研究
18.
The supervision control of multi-used prefabricated concrete fixed crane base construction
混凝土预制拼装多用塔机基础施工的监理控制