1) RCC cofferdam dismantling
RCC围堰拆除
2) cofferdam removal
围堰拆除
1.
Based on analysis of complex spatial-temporal relation of multi-phase diversion,as Chang- zhou water control project,discharge relation of cofferdams space position is induced into typical dis- charge modes which are also combined to describe temporal relation of cofferdam removal.
针对分期导流复杂的时空关系进行分析,以长洲水利枢纽导流工程为例,将不同时期围堰空间位置组合形成的泄流关系归纳为典型泄流方式进行描述,各期围堰拆除的时间关系表现为各类典型泄流方式的组合。
3) RCC cofferdam
RCC围堰
1.
Key technologies and design for RCC cofferdam removal of Three Gorge Reservoir;
三峡三期RCC围堰拆除方案与设计关键技术研究
2.
Blasting Technology for Dismantling the RCC Cofferdam of Letan Hydropower Project;
乐滩水电站RCC围堰拆除爆破技术
3.
By introducing the way of the construction of readers blasting,network used in the Sanxia Gorges RCC cofferdam demolition,it can be understood in deeply and used as a reference for similar projects.
文章介绍了I-Kon电子起爆系统组成、工作原理和优缺点,通过介绍三峡RCC围堰拆除爆破网路施工总结,以便读者更深入地了解I-Kon电子起爆系统,旨在今后供同类施工借鉴。
4) downstream RCC cofferdam
下游RCC围堰
1.
The concrete construction of downstream RCC cofferdam of Goupitan Hydropower Station has the feactures of short construction period, high intensity, and high quality requirement.
构皮滩水电站下游RCC围堰混凝土施工具有工期紧、强度大、施工质量要求高等特点。
5) third-stage RCC cofferdam
三期RCC围堰
1.
Key technical problems of the construction of the third-stage RCC cofferdam of Three Gorges Project;
三峡三期RCC围堰施工关键技术
补充资料:拆除
1.拆掉,除去。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条