1) RCC cofferdam of TGP
三峡工程RCC围堰
1.
The demolition blasting of RCC cofferdam of TGP is carried out underwater 40 m depth;the analog test is done to examine the watertightness and the bond resistance of blast-hole stems;the details are described.
三峡工程RCC围堰拆除爆破是在水下40 m深处进行,为了验证炮孔封堵材料的密封性和粘着抗力而进行了模拟试验,对试验的细节加以介绍。
2) the stage III works (RCC Cofferdam project) of the Three Gorges Project
三峡Ⅲ期RCC围堰
4) 2nd-stage upstream cofferdam of Three Georges Project
三峡工程二期上游围堰
5) third-stage RCC cofferdam
三期RCC围堰
1.
Key technical problems of the construction of the third-stage RCC cofferdam of Three Gorges Project;
三峡三期RCC围堰施工关键技术
6) RCC cofferdam
RCC围堰
1.
Key technologies and design for RCC cofferdam removal of Three Gorge Reservoir;
三峡三期RCC围堰拆除方案与设计关键技术研究
2.
Blasting Technology for Dismantling the RCC Cofferdam of Letan Hydropower Project;
乐滩水电站RCC围堰拆除爆破技术
3.
By introducing the way of the construction of readers blasting,network used in the Sanxia Gorges RCC cofferdam demolition,it can be understood in deeply and used as a reference for similar projects.
文章介绍了I-Kon电子起爆系统组成、工作原理和优缺点,通过介绍三峡RCC围堰拆除爆破网路施工总结,以便读者更深入地了解I-Kon电子起爆系统,旨在今后供同类施工借鉴。
补充资料:长江三峡工程
长江三峡工程,是一项容防洪、发电、航运、养殖和供水于一体的大型综合水利枢纽工程。坝址选在湖北省宜昌县境内三斗坪镇。工程的拦江大坝全长