1.
The post-blasting investigation of the effect of blasting indicated that the demolition blasting of the cofferdam was successful.
爆破效果调查表明,此次围堰拆除爆破是成功的。
2.
Design optimization and removal of the cofferdam in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程围堰设计优化及围堰拆除的设计与施工
3.
The Study ON the Key Influencing Factors of Diversion Tunnel Cofferdam Slag Blasting Remove Effect
导流洞围堰拆除爆破冲渣效果关键影响因素研究
4.
Blasting Demolition Technology of Cofferdam at the Entrance and Exit of Right Diversion Tunnel in Jinping Stage I Hydropower Station
锦屏一级水电站右岸导流洞进出口围堰爆破拆除安全技术
5.
Successful experiences in blasting demolition of an underwater cofferdam of Dayuandu power station is introduced briefly, which are useful for the designing other similar blasting demolition project.
介绍了大源渡航电枢纽工程河中混凝土纵向围堰上游连接段水下拆除爆破的成功经验。
6.
Love your neighBour, yet pull not down your fence.
爱你的邻居,但不可拆除围墙。
7.
Injection groove by the removal of the surrounding tiles, switch cupboard.
按要求拆除喷油槽周围的纸皮,改用铁皮。
8.
if they refuse to do so, they shall be ordered to pull them down.
拒不拆除的,责令拆除。
9.
The whole area will remain cordoned off while the demolition work is going on.
在拆除旧建筑物工程进行期间,整个地区将一直用栅栏围
10.
The Stability of Taking Apart Contemporary Middle Wall in Tunnel Building and Its Technological Measure Research;
隧道施工中拆除临时中隔壁围岩稳定性及其技术措施的研究
11.
Study on the Impact of the Stability of Surrounding Buildings under Deep Foundation Support Blasting
深基坑支撑爆破拆除对周围建筑物稳定性的影响研究
12.
Combined with the surroundings of the reinforced concrete gate, a suitable blasting demolition program is selected, the effectiveness is satisfactory.
结合待拆钢筋混凝土大门的周围环境,选取了合适的爆破拆除方案,爆破效果较好。
13.
remove a barrier between
拆除在...中间障碍
14.
Guide for design of cofferdam for hydropower and water conservancy project
水利水电工程围堰设计导则
15.
Construction Technology for Large Double Wall Steel Cofferdam in Strong Bore Section
强涌潮河段大型双壁钢围堰施工技术
16.
Construction of Bored Piles in Double wall Steel Cofferdam for the Second Changjiang River Bridge in Wuhan
武汉长江二桥双壁钢围堰钻孔桩施工
17.
The Steel-cofferdam Design of the Main Towers of Anqing Changjiang River Highway Bridge
安庆长江公路大桥主塔墩钢围堰设计
18.
Study on the Proposal of the Third Stage RCC Arch Cofferdam for Three Gorges Project;
三峡三期碾压混凝土拱围堰方案研究