1) Danjiangkou Water Transfer Project
丹江口调水工程
1.
Effect of Danjiangkou Water Transfer Project on Shaanxi and regional economy and its countermeasures;
丹江口调水工程对陕西及区域经济发展的影响与对策
2) Danjiangkou Project
丹江口工程
3) first-phase project of Danjiangkou Hydraulic Project
丹江口初期工程
4) Danjiangkou Dam heightening project
丹江口大坝加高工程
1.
The paper discusses the technology requirement,construction programs,methods and quality control measures on construction of jointing old and new concrete in Danjiangkou dam heightening project of Middle Line of the South-to-North Water Transfer Project.
论述了南水北调中线水源工程丹江口大坝加高工程贴坡新老混凝土结合施工的技术要求、施工程序、施工方法及质量控制措施等。
2.
In dam base widening excavation construction of left bank of Danjiangkou dam heightening project, it is essential not to produce crack by blasting in old dam body to ensure dam safety, especially to ensure normal operation plant and other equipments.
在丹江口大坝加高工程左岸坝段扩大基础开挖施工中,除了要防止老坝体混凝土因爆破产生裂缝外,还要保证大坝的安全运行,特别是电厂及相关设备的正常运行,因此采用了控制爆破施工技术,并加强了对爆破过程中的安全监测和立体安全防护工作,取得了较好的效果。
5) Danjiangkou reservoir
丹江口水库
1.
On the service function of Danjiangkou reservoir wetland ecosystem;
丹江口水库湿地生态系统服务功能研究
2.
Research on the Compensation System and Analyse of the Integrated Benefit Transformation in Danjiangkou Reservoir;
丹江口水库综合效益转换分析及补偿制度研究
3.
Study of the Traditional Dwellings in Danjiangkou Reservoir Zone;
丹江口水库淹没区传统民居研究
6) Water quality on Danjiangkou reservoir
丹江口水质
补充资料:江程
1.江上的航程。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条