1) the Dafengjiang water transfer project
大风江调水工程
2) Dafengjiang water diversion
大风江调水
1.
Flume structural design analysis for Dafengjiang water diversion project;
大风江调水工程渡槽结构设计分析
3) Danjiangkou Water Transfer Project
丹江口调水工程
1.
Effect of Danjiangkou Water Transfer Project on Shaanxi and regional economy and its countermeasures;
丹江口调水工程对陕西及区域经济发展的影响与对策
4) Yujiang water diversion project
郁江调水工程
1.
Pre-consolidation grouting design for the tunnel exit section of Yujiang water diversion project
郁江调水工程引水隧洞出口段预加固灌浆设计
5) Southward Transfer Project of the Yalu River Waters
鸭绿江水南调工程
1.
It is shown that Southward Transfer Project of the Yalu River Waters (STRYR) and Water Transfer Project in Long Lake Reservoir Area (WTPLLRA) enjoy better feasibility and are superior than WRPSNWT.
针对国内对兴建南水北调西线工程提出的种种质疑以及其所存在的无法回避的某些弊端问题,再次提出替代方案,认为鸭绿江水南调工程、湖北长湖调水工程具有更好的可行性、优越性。
6) large water diversion project
大型调水工程
1.
Main problems and countermeasures in the management of construction contract of large water diversion project;
大型调水工程建设合同管理存在的问题及对策
补充资料:琼莱调水工程
琼莱调水工程 |
Jonglei Canal |
概 述 |
为了解决苏德沼泽地区因蒸发而产生的水量损失问题兴建了琼莱调水工程。工程以琼莱以南70km的博尔作为起点,至白尼罗河与索巴特河汇合处马拉卡勒。运河全长350km,底宽46~52m,深4.5m,边坡1∶2,总共挖掘土方8700万m3。引水流量230m3/s,相当于杰贝勒河在蒙加拉平均流量的四分之一。工程分三期施工。第一期工程于1978年6月开始。除开挖运河外,在运河首尾分别建节制闸以控制进出水量。运河竣工后由于苏德沼泽地区蒸发失水量减少,尼罗河在马拉卡勒的年径流量将增加47亿m3,由埃及、苏丹两国平分。 |