1) bulk power system reliability evaluation
大电力系统可靠性评估
1.
In order to alleviate the calculation catastrophe of bulk power system reliability evaluation, a coarse-grain parallel Monte Carlo simulation methodology and its asynchronous implementations combining convergence checking, based on HPC (high performance computation)Cluster and MPI(message passing interface)communication mechanism, are presented.
针对大电力系统可靠性计算的高度复杂性,基于高性能集群环境,建立了粗粒度Monte Carlo并行计算模型,提出了消息传递机制下配合收敛控制的异步化并行算法,以较高的加速比和并行效率,快速实现大电力系统可靠性评估计算。
4) Power System Operational Reliability Evaluation
电力系统运行可靠性评估
5) system reliability assessment
系统可靠性评估
1.
Researching the application of Bayesian network to the system reliability assessment for the limits of combination method and state method in reliability assessment.
针对现有组合法与状态法在可靠性评估方法中的局限性,对基于贝叶斯网络的系统可靠性评估新方法进行了研究。
6) systematic assessment and reliability analysis
系统评估与可靠性分析
补充资料:电力系统可靠性基本数据
电力系统可靠性基本数据
basic data for power system reliability
运则指机组可以延长运行到周末,但在下一个计划停运期前须退出可用状态的非计划停运.国际发供电联盟(Inrernational Union of Pr叼ueers and Disrributors ofEleetrieal Energy,uNIPEnE)则定义所有不属于年度维修计划的停运都是强迫停运。 机组状态的划分可用图2表示。可~{孺‘不,.{装荞月{降低出力时间、计划降低出力时间、非计划降低出力时间、强迫降低出力时间和维修降低出力时间等。 通常计算用等值时间来表示机组的降低出力,即机组在降低出力的运行时间乘以降低出力的百分数,如一台200 MW机组降低出力50 MW、20 h.则等值时间为25%xZo一5(h)。 能t值能量值(energy quantity)可用总值或净。。·{季节性降低出力O}一最大容且「{G】,,.迫停通二停运备用停机降低出力强l维}计值表示。最重要的两个值为:①在给定时段内测得的机组发电量即实际发电量(aetual gener-ation);②在给定时间内机组连续运行在最大容量时可能发出的电量,即最大发电量(maxi-mum generation)。划停︸还修停运迫停运C备用停机 图2机组状态划分图 容t水平运行机组发出铭牌容量的程度。容量水平可分为机组的最大容量、可靠容量、季节性减少出力、可用容量和机组降低出力等五类。 (1)机组的最大容量(maximum eapaeity ofaunit)。在规定(设计)的环境温度条件下的容量。 (2)可靠容量(dependable capaeity)。在某一特定时期中受环境条件限制(如夏季循环水温升高,出力下降)而修正后的最大容量。 (3)季节性减少出力(seasonal deraring)。最大容量与可靠容量之差。 (4)可用容量(available Capaeity)。任何时候受设备条件限制修正后的可靠出力。 (5)机组降低出力(unit derating)。可靠容量与可用容量之差,或称部分停运或限制出力。它又可分为计划和非计划降低出力。非计划降低出力又可进一步分为强迫和维修降低出力。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条