2) underground structure group construction
地下洞室群施工
1.
According to the characteristics of underground structure group construction in hydraulic power project,a method for schedule forecasting and control based on real-time simulation was presented with cycle ope-ration network simulation and network analysis techniques.
针对水电工程地下洞室群的施工特性,采用循环网络仿真与网络计划分析技术,提出了基于实时仿真的地下洞室群施工进度预测与控制方法。
3) optimization of group of caver constrnction
洞室群施工优化
4) large-scale underground structure group construction
大型地下洞室群施工
1.
The large-scale underground structure group construction is an extremely complicated process.
大型地下洞室群施工是一个极其复杂的过程 。
5) culvert construction
涵洞施工
1.
Application of the push bench construction process in the culvert construction;
顶管施工法在涵洞施工中的应用
2.
Quality control of culvert construction on weak foundation;
软弱地基涵洞施工的质量控制
6) tunnel construction
隧洞施工
1.
Development law of karst and influence on tunnel construction in marble region;
大理岩区喀斯特发育规律及其对隧洞施工的影响
2.
The application of NATM to Guan Yin Shan tunnel construction in Dongjiang-Shenzhen supply modification works;
“新奥法”在东江—深圳供水改造工程观音山隧洞施工中的应用
3.
Taking water diversion project in Ningbo city Baixi Reservoir as an example,the application of automatic pumping equipment in the lower broken rock,water-rich and full drainage tunnel construction costs is presented.
以宁波市白溪水库引水工程为例,介绍了自动抽水装置在降低破碎围岩、富水充分隧洞施工排水费用中的应用。
补充资料:焊接施工完成的球罐群
焊接施工完成的球罐群
焊接施工完成的球罐群
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条