1.
Study on the Regulations of the Effects on Environment Caused by Municipal Multi-tunnels Construction;
城市地下洞群施工对周边环境影响规律研究
2.
RESEARCH ON GROUNDWATER TRANSPORT,INFLUENCE AND CONTROL IN TUNNELGROUP OF JINPING II HYDROPOWER STATION DURING CONSTRUCTION
锦屏二级水电站隧洞群施工期地下水运移、影响及控制研究
3.
Construction control for engineering geologic body of underground power house chambers
地下厂房洞室群工程地质体施工控制
4.
Research on Ventilation for Large Scale Underground Cavity Groups Construction;
大型地下工程洞室群施工期通风研究
5.
Discussion on the Construction Scheme of Tunnel Entrance in Crowded Population Area
隧道洞口位于人群聚居区出洞施工方案探讨
6.
Construction Numerical Simulation of Cavern Group in Underground Hydropower House;
水电站地下厂房洞室群施工数值仿真
7.
Study of Land Subsidence Induced by Construction of Urban Metro Tunnels for Mutil-Tunnel System;
城市地铁群洞隧道施工地表沉降研究
8.
Study on the Construction Characteristic of Underground Carvens Group for Goupitan Hydropower Station;
构皮滩电站地下洞室群施工特性研究
9.
Research on System Simulation Theory and Application for Construction Processes of Large-Scale Underground Structure Group;
大型地下洞室群施工系统仿真理论与应用研究
10.
Nuozhadu Underground Powerhouse Cavern Group Study of Rational Sequence Constructiong;
糯扎渡水电站地下厂房洞室群施工顺序研究
11.
Monitoring at Construction Period and Dynamic Reinforcement of Underground Power House Group;
地下洞室群施工期监测与动态支护设计研究
12.
Real-Time Control for Construction Scheduling of Large Scale Underground Structure Group;
大型地下洞室群施工进度实时控制研究
13.
The Numerical Simulation of Subway Ultra-Shallow Holes and Study of the Related Issues about Construction
地铁超浅埋群洞数值模拟及施工相关问题研究
14.
Feedback Analysis Based on Monitoring of the Caverns Excavation of Underground Hydropower Plants
水电站地下厂房洞室群施工监测反馈分析
15.
Optimization of Construction Scheme of Group Tunnels with Small Spacing
小间距群洞施工影响效应方案优化研究
16.
Three Dimensional Numerical Simulation Analysis on Underground Powerhouse Complex Construction
地下厂房洞室群施工过程的三维数值模拟分析
17.
Construction Optimization of Large Underground Chamber Group and Research of Surrounding Rock Stability;
大型地下洞室群施工方案优化及围岩稳定性研究
18.
Study on Dynamic Visual Simulation and Optimization for Ludila Underground Structure Group Construction;
鲁地拉地下洞室群施工动态可视化仿真与优化研究