2) excavation and support sequence
施工时序
1.
Based on centrifuge model tests and numerical calculation,the deformation failure and stress field due to different excavation and support sequences,are analyzed.
不同施工时序对边坡稳定性有较大影响,应用离心模型试验和数值计算研究和分析不同施工时序对边坡变形破坏和应力场的影响。
3) construction space-time
施工时空
1.
This paper makes a thorough study of construction space- time random simulation of a group of underground chambers by means of the cycle network technique, taking into consideration both the features and experiences in construction of underground caverns and using the experiences and results obtained in the past study for reference.
本文以循环网络技术为基本技术手段,结合地下洞室群的施工特点和经验,在借鉴过去研究的经验和成果的基础上,深入进行了地下洞室群施工时空的随机模拟研究。
4) time diffence in construction
施工时差
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条