1) generator sockets construction
机窝施工
1.
The generator sockets construction and the closely-related stability problem of lower side wall of Shuibuya Underground Powerhouse are key problems to solve in the powerhouse construction.
按照上述流程,利用前6层开挖的现场监测信息对有关岩层的力学参数进行反分析,根据反分析的参数对后续的机窝施工进行数值模拟计算和方案优化。
2) construction machinery
施工机械
1.
Effect of fuel oil pollution on use of engine of construction machinery and countermeasures;
燃油污染对施工机械发动机使用的影响及对策
2.
Test study on roadbed construction machinery compose of the desert subgrade;
沙漠地区路基施工机械组合试验研究
3.
Study on the optimal allocation method of construction machinery based on multi-objective optimization;
基于多目标优化的施工机械设备优化配置方法研究
5) construction machine
施工机械
1.
On the reasonable allocation and management of the construction machines of earth cubic project;
浅谈土石方工程施工机械的合理配置及管理
2.
Optimal Allocation Method of Construction Machine about Highway Surface;
公路路面施工机械的优化配置方法
3.
Object method used to calculate productivity and operation efficiency of construction machine;
用实物法计算施工机械生产率和运行效率
6) pile engine construction
桩机施工
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条