说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 有姿态要求的轨迹
1)  claim trajectory with gesture claim
有姿态要求的轨迹
2)  trajectory with velocity
有速度要求的轨迹
3)  carriage and track of the bodywork
车身姿态与轨迹
1.
The movement of vehicle is a kind of complex dynamic process, so it is of great significance to measure the carriage and track of the bodywork and wheel force in multi-direction for researching and estimating the dynamic performance of the vehicle, such as braking (including swerve), suspension, navigation stability and road profile collecting.
依托本课题组承担的江苏省交通科学研究计划项目《车辆安全性能评价及检测装置研究》(项目编号:05C02),以设计开发一种便携式的汽车道路试验数据采集及分析系统为目的,本文研究了多传感器测量技术原理和采集方案,设计了车身姿态与轨迹测量方法、数据采集装置等硬件及相关软件,并组成系统在汽车道路试验中得以应用,验证了系统设计的正确性和可靠性。
4)  track-pose simulation model
轨迹-姿态仿真模型
5)  orbital attitude
轨道姿态
1.
Determination of satellite orbital attitude from vector observation:Euler-angle estimator;
基于矢量观测确定卫星轨道姿态:欧拉角估计器
2.
A new real-time filtering algorithm for orbital attitude estimation of three-axis stabilized satellite is presented for the typical attitude determination mode composed of vector observations and gyros.
针对“矢量观测+陀螺”这种典型的三轴稳定卫星姿态确定系统模式,引入具有四元数优越性的Gibbs矢量作为姿态参数,提出了一种新的具有良好实时性能的轨道姿态估计方案。
6)  run-off attitude
离轨姿态
补充资料:发包人要求承包人按时开工和按要求施工的权利
发包人要求承包人按时开工和按要求施工的权利:承包人应当按照合同的约定做好开工前的准备工作,负责作好施工场地的平整,施工界区内用水、用电、道路、以及临时设施的施工:编制施工组织设计或施工方案;按照约定作好材料和设备的采购、供应和管理;向发包人提供应由发包人供应的材料、设备的计划,承包人应按照合同约定的开工日期按时开工。在施工中,承包人须严格按照施工图及说明书进行施工,承包人不按照施工图和说明书施工而造成工程质量不符合合同约定条件的,应当负责无偿修理或者返工。《民法》第一版 第515页 魏振瀛 北京大学出版社
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条