1)  incremental launching construction technology
顶推施工技术
1.
Combined with practical work,from technological process,erection of consolidation platform and incremental launching platform,fabrication and installation of slide rail,field assembly of steel box beam and other aspects incremental launching construction technology of steel box beam is introduced in order to provide references for similar works.
结合工程概况,从顶推施工工艺流程、钢箱梁拼装平台及顶推平台搭设、滑道制作安装、钢箱梁现场拼装、钢梁顶推及落梁等方面介绍了主桥钢箱梁的顶推施工技术,以供类似工程参考借鉴。
2)  the pipe jacking construction technology
顶管施工技术
1.
As a modern laying pipe jacking technics, the pipe jacking construction technology has much advantage.
顶管施工技术作为一种现代化的管道敷设施工方法,具有很多优点。
3)  crest enters the method construction technique
顶进法施工技术
4)  incremental launching construction
顶推施工
1.
Combined with practical engineering of west bridge in Zhujiang bridge,the author separately illustrates the construction technology and time-limit of traditional bearing changing method and improved bearing as sideway,compares the two bearings,and introduces the selection of new-type bearing,in order to accumulate experience for bridge incremental launching construction.
结合珠江大桥西桥工程实例,分别阐述了传统的更换支座方法的施工工艺及工期和改进支座兼作滑道的施工工艺及工期,并对其进行了比较,最后介绍了新型支座的选型,为桥梁顶推施工积累了经验。
2.
The reasonable arrangement of the launching nose will be critical to the smooth proceeding of incremental launching construction of the whole bridge.
导梁的长度、刚度及重量在顶推施工阶段对顶推主梁的内力有着重要的影响,其合理配置是全桥顺利顶推的关键。
3.
The main shipping channel bridge and the non-navigable span approach bridges of the Bridge respectively make use of the long span continuous composite arch bridges and continuous composite box girder bridges that are all erected by the multi-point and synchro incremental launching construction technique.
其中,引桥顶推施工时,85 m跨间无临时墩;主桥顶推施工时,210 m跨间仅设置1座临时墩。
5)  incremental launching
顶推施工
1.
A description is given about the incremental launching technology used in the 96-meter double-track simply-supported trussed girder passing over the second ring road of Beijing.
介绍了京津城际轨道交通工程改京山线96 m双线简支钢桁架梁跨越北京市二环路顶推施工技术,该桥施工时因地制宜,充分利用二环路的辅路空间以尽量减小顶推跨度,上滑道采取间断式布置,下滑道采用不连续多段长滑道,用八三式军用墩器材搭设临时墩,并在主梁前方加设长导梁,顺利完成了钢桁梁顶推架设。
2.
Incremental launching method is popular in long span skew continuous beam bridges which are across canyons because constructing of freeways in the mountains of western China are limited by land feathers 、geological conditions and highway alignment .
0 有机结合,编制了“斜梁桥顶推施工仿真计算分析”程序。
3.
The construction methods of steel box girder in Ji\'nan Huanghe cable-stayed bridge of Qingdao-Yinchuan Highway breaks the traditional incremental launching technology.
青银高速济南黄河大桥斜拉桥钢箱梁施工方法突破了传统的顶推施工工艺,采用在每一个临时墩上设置棘块式顶推设备的方法,实现了由简单的拖拉式顶推到真正意义上的顶推施工方法的转变。
6)  incremental lounching
顶推施工
1.
In box culvert incremental lounching construction,precipitation and covering water are often carried on contemporarily so as to ensure the box culvert and its bottom be avoided the effect of water,and ensure the construction to go on wheels.
在箱涵顶推施工中,为保证箱涵及涵底免受地下水的影响,需要同时进行降水和封水措施,以确保施工的顺利进行。
2.
This paper introduces the application of MATLAB to programming for continuous girder bridge by incremental lounching, particularly for analyzing the course internal force dynamic analysis.
文章介绍了MATLAB语言在顶推施工预应力混凝土连续梁桥施工过程内力动态分析程序设计中的应用 ,从而说明基于MATLAB语言开发结构分析软件的可行性与优越性。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise