宝珠寺水电站 |
Baozhusi Hydropower Station |
概 述 |
宝珠寺水电站位于中国四川省广元市、嘉陵江支流白龙江下游,距昭化18km。混凝土重力坝,最大坝高132m。校核水位时水库总库容25.5亿m3,水电站装机容量70万kW,保证出力16万kW,多年平均发电量22.78亿kW·h。工程以发电为主,兼有防洪、灌溉效益,灌溉面积可达15.5万hm2。1984年复工,1996年第一台机组发电,1998年竣工。 |
|
|||||||
说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
|
|||||||
1) Baozhusi hydropower station
宝珠寺水电站
1.
Layout and key technical issues of Baozhusi hydropower station;
宝珠寺水电站枢纽布置及重点技术问题
2.
Prototype observation of discharge atomization at Baozhusi Hydropower Station;
宝珠寺水电站泄洪雾化原型观测
3.
The Baozhusi hydropower station is the last mandatory project under state planned economy system.
宝珠寺水电站工程是国家计划经济体制下的最后一个指令性工程,随着水电建设体制改革的进一步发展,宝珠寺水电站工程建设由施工单位总承包转换为业主负责制的建设管理模式。
2) Baozhusi hydropower plant
宝珠寺水电站
1.
Application of epoxy material in reinforcement of the draft-tube concrete defect of Baozhusi hydropower plant;
环氧材料在宝珠寺水电站尾水管混凝土缺陷修补中的应用
2.
Safety management of hydraulic structures at Baozhusi hydropower plant;
浅谈宝珠寺水电站水工建筑物的安全管理
3) Baozushi Hydropower Station
宝珠寺电站
4) Baozhusi hydropower plant
宝珠寺电厂
1.
This paper presents problems in SF6 circuit breaker at outlet of generator-transformer bank at Baozhusi hydropower plant,annual inspection test and major repair after dismantling.
通过对宝珠寺电厂发变组出口SF6断路器出现的问题、年检预试、解体大修情况的介绍,分析了断路器参数变化的主要原因及处理情况并提出了对策,对同样工况下断路器出现问题的解决具有参考和借签意义,提出了对在承担调峰、调频和事故备用任务电厂使用的高压断路器有待进一步探讨的问题。
2.
Since Baozhusi hydropower plant has been put into commission , hydraulic structures and main mechanical and electrical equipment are well operated ,but some control devices , automation components and auxiliary equipment went wrong leading to shutdown .
对宝珠寺电厂技术改造工作进行了回顾 ,总结了技术改造成功的经验和教
5) Baozhusi
宝珠寺
1.
By studying the dynamic stratification characteristics of the water body in different seasons in Baozhusi Reservoir by using contrastive experiment,the results show that more than half of the water body\'s physicochemical indexes in May are closely related to the depth of the water.
通过取水样对比试验,研究了宝珠寺水库水体在不同季节里的物理化学指标分层特性,结果显示:5月的水体,超过一半的指标表现出非常明显的水深相关性,而12月的水体,仅有pH、CO32-、矿化度3项指标表现出微弱的水深相关性,其余指标均未表现出深度分层特性。
6) Siping hydropower station
寺坪水电站
1.
Grouting tests were carried out in accordance with the characteristics of the soft rock dam foundation at the Siping hydropower station to investigate effective methods and technologies for raising the grouting pressure in the treatment of soft rock da.
本次灌浆试验针对寺坪水电站大坝坝基软弱岩体的特殊性,研究及探索在中—弱透水性软弱岩层坝基处理中有效提高灌浆压力的方法和工艺。
2.
The height of face slab rock fill dam at Siping hydropower station is 90.
寺坪水电站面板堆石坝坝高90。
补充资料:宝珠寺水电站
|